Project intelligenceTDLR TABS2023008933New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Burton ISD 2021 Bond Program

701 N RR St, Burton, TX, 77835

Target date passed (Dec 2024)Review Complete

Burton ISD 2021 Bond Program is a new construction project at 701 N RR St, Burton, in Washington County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Dec 2024 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $44.0M across about 74,800 sq ft.

Estimated project value
$44.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
74,800 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$588/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 years
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 9, 2023722 days across supplied datesDec 31, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    7 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    715 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77835 (Burton)

One email per change. Unsubscribe in one click. Privacy.

Burton ISD 2021 Bond Program is a New Construction project located at 701 N RR St, Burton, TX 77835 in Burton, Texas. The project has an estimated value of $44.0M covering 74,800 sq ft. Dr. Edna Kennedy is the property owner and Reliance Architecture is the design firm of record. The project was registered with TDLR on January 9, 2023.

Frequently Asked Questions

What is Burton ISD 2021 Bond Program?

Burton ISD 2021 Bond Program is a new construction project at 701 N RR St in Burton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New construction of Junior high, high school, stadium, parking lot and site. Renovation of existing cafeteria and site.

Is Burton ISD 2021 Bond Program open in Burton?

Burton ISD 2021 Bond Program was scheduled to finish construction in Dec 2024 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Burton ISD 2021 Bond Program located?

Burton ISD 2021 Bond Program is located at 701 N RR St, Burton, TX, 77835, in Washington County.

Who is the owner or developer of Burton ISD 2021 Bond Program?

Dr. Edna Kennedy is the property owner/developer of record for Burton ISD 2021 Bond Program, per its TDLR project registration.

Who is the architect or design firm for Burton ISD 2021 Bond Program?

Reliance Architecture is the design firm of record for Burton ISD 2021 Bond Program, according to its TDLR filing.

How much does Burton ISD 2021 Bond Program cost and how big is it?

Burton ISD 2021 Bond Program has an estimated construction value of $44.0M and approximately 74,800 square feet (about $588/sqft), based on its TDLR filing.

Scope of Work

New construction of Junior high, high school, stadium, parking lot and site. Renovation of existing cafeteria and site.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

701 N RR St, Burton, TX, 77835

Loading location map…
30.18240, -96.59837

Watch all construction in 77835 (Burton)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.