Modular Power - Phase 2 in Lewisville, TX

801 Spinks Rd Suite #100, Lewisville, TX, 75067

Construction complete · Jul 2023Project Closed

Modular Power - Phase 2 is a renovation/alteration project at 801 Spinks Rd Suite #100, Lewisville, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2023). The project has an estimated value of $750K across about 5,275 sq ft.

Estimated project value
$750K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
5,275 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$142/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 10, 2023202 days across supplied datesJul 31, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    49 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    153 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75067 (Lewisville)

One email per change. Unsubscribe in one click. Privacy.

Modular Power - Phase 2 is a Renovation/Alteration project located at 801 Spinks Rd Suite #100, Lewisville, TX 75067 in Lewisville, Texas. The project has an estimated value of $750K covering 5,275 sq ft. Centerpoint Properties is the property owner. The project was registered with TDLR on January 10, 2023.

Frequently Asked Questions

What is Modular Power - Phase 2?

Modular Power - Phase 2 is a renovation/alteration project at 801 Spinks Rd Suite #100 in Lewisville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: First Generation Office build out within existing warehouse vacancy

Is Modular Power - Phase 2 open in Lewisville?

Construction on Modular Power - Phase 2 is complete — TDLR records show the project passed its required accessibility inspection in Jul 2023. The building is finished and very likely open.

Where is Modular Power - Phase 2 located?

Modular Power - Phase 2 is located at 801 Spinks Rd Suite #100, Lewisville, TX, 75067, in Dallas County.

Who is the owner or developer of Modular Power - Phase 2?

Centerpoint Properties is the property owner/developer of record for Modular Power - Phase 2, per its TDLR project registration.

How much does Modular Power - Phase 2 cost and how big is it?

Modular Power - Phase 2 has an estimated construction value of $750K and approximately 5,275 square feet (about $142/sqft), based on its TDLR filing.

Scope of Work

First Generation Office build out within existing warehouse vacancy

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

801 Spinks Rd Suite #100, Lewisville, TX, 75067

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75067 (Lewisville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Lewisville?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.