๐ŸProject Closed๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project is privately funded, on private land for private use.

Walmart #1303-258 Georgetown, TX - CSP

620 S. Interstate 35, Georgetown, TX 78628, Georgetown, TX, 78628
Completed100%

๐Ÿ“ŠProject Metrics

TDLR #TABS2023009226
$1.5M
Project Value
4,686
Square Feet
$320/sqft
Cost/SqFt
3 months
Duration
Registered:Jan 11, 2023
Start:Jun 4, 2023
Target:Sep 7, 2023
๐Ÿ

Project Closed

Project has been completed and closed

๐Ÿ“‹Scope of Work

Online Grocery Pickup Building Addition

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
January 11, 2023
Project Closed
September 7, 2023
Construction Start
June 4, 2023
Expected Completion
September 7, 2023

๐Ÿ“Location & Views

Open in MapsGet Directions|30.64260, -97.68811

๐Ÿ“„Related City Permits

Building permits found at or near this location

6201 SHADOW MOUNTAIN CV
20.83 mi away

Interior Remodel Interior remodel of 1st floor kitchen and mudroom 2nd floor primary bedroom bath and home office addition of sliding door on 2nd floor covered terrace

ActivePlumbing PermitAddition and RemodelFeb 2026
View Details
2025-158123 PP
๐Ÿ”งTalos Plumbing LLC dba Neighborhood Plumbing and Drain
6203 SHOALWOOD AVE
21.26 mi away

6203 Shoalwood Homebuilder loop Ref: 2026-014980-BP

ActiveElectrical PermitHomebuilder LoopFeb 2026
View Details
2026-019691 EP
๐Ÿ”งIn Charge Electrical Services
6203 SHOALWOOD AVE
21.26 mi away

ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [5bed 4.5bath] with Attached Carport.

ActivePlumbing PermitNewFeb 2026
View Details
2026-014980 PP
๐Ÿ”งProtex Plumbing & Mechanical, LP
6205 N LAMAR BLVD
21.66 mi away

We will be removing the existing failing grease interceptor and installing a new codeยฟcompliant grease trap in the same general location. Work includes excavation demolition of the existing interceptor installation of new piping connections setting the new interceptor and restoring the work area to grade. Detailed Scope: Excavate to expose the existing grease trap and associated inlet/outlet piping. Disconnect and remove the existing grease interceptor including damaged or nonยฟcompliant piping sections. Install a new (Cityยฟapproved) grease interceptor sized per fixture count and City of Austin Industrial Waste requirements. Set the new unit on a properly compacted and leveled base. Reconnect all inlet and outlet plumbing using approved materials and fittings. Install new cleanouts as required by current code. Ensure proper flow line elevations and venting per Austin Water and UPC/IPC requirements. Backfill and compact the excavation area; restore concrete/asphalt or surface material as needed. Perform final testing for watertightness flow and proper operation. Submit required SAWS/Industrial Waste documentation including asยฟbuilt information and fixture count verification. No changes to existing building water distribution or sewer layout beyond the grease trap connections. All work will comply with City of Austin Plumbing Code Industrial Waste regulations and Whataburger operational safety requirements.

ActivePlumbing PermitGrease Interceptor (GI) replacementFeb 2026
View Details
2026-016955 PP
๐Ÿ”งSouthwaste Disposal
6203 SOFTWOOD DR
31.78 mi away

Per City Of Austin GO Repair Program we need five newly installed kitchen outlets inspected

ActiveElectrical PermitRepairFeb 2026
View Details
2026-019610 EP
๐Ÿ”งTop Tier Electric

Get alerts for Williamson

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists