Project intelligenceTDLR TABS2023009239New Construction
Funding type

This project is privately funded, on private land for private use.

Sienna Crossing - Lot 1

9320 & 9330 HIGHWAY 6, Missouri City, TX, 77459

Construction complete · Nov 2024Project Closed

Sienna Crossing - Lot 1 is a new construction project at 9320 & 9330 HIGHWAY 6, Missouri City, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2024). The project has an estimated value of $6.0M across about 38,598 sq ft.

Estimated project value
$6.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
38,598 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$155/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 8mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 12, 2023659 days across supplied datesNov 1, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    63 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    596 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77459 (Missouri City)

One email per change. Unsubscribe in one click. Privacy.

Sienna Crossing - Lot 1 is a New Construction project located at 9320 & 9330 HIGHWAY 6, Missouri City, TX 77459 in Missouri City, Texas. The project has an estimated value of $6.0M covering 38,598 sq ft. Sienna Cypress, LLC is the property owner and Boucher Design Group, LLC is the design firm of record. The project was registered with TDLR on January 12, 2023.

Frequently Asked Questions

What is Sienna Crossing - Lot 1?

Sienna Crossing - Lot 1 is a new construction project at 9320 & 9330 HIGHWAY 6 in Missouri City, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sitework and (2) new shell building construction to be leased to multiple tenants. Each tenant lease space is to be permitted under separate permit.

Is Sienna Crossing - Lot 1 open in Missouri City?

Construction on Sienna Crossing - Lot 1 is complete — TDLR records show the project passed its required accessibility inspection in Nov 2024. The building is finished and very likely open.

Where is Sienna Crossing - Lot 1 located?

Sienna Crossing - Lot 1 is located at 9320 & 9330 HIGHWAY 6, Missouri City, TX, 77459, in Fort Bend County.

Who is the owner or developer of Sienna Crossing - Lot 1?

Sienna Cypress, LLC is the property owner/developer of record for Sienna Crossing - Lot 1, per its TDLR project registration.

Who is the architect or design firm for Sienna Crossing - Lot 1?

Boucher Design Group, LLC is the design firm of record for Sienna Crossing - Lot 1, according to its TDLR filing.

How much does Sienna Crossing - Lot 1 cost and how big is it?

Sienna Crossing - Lot 1 has an estimated construction value of $6.0M and approximately 38,598 square feet (about $155/sqft), based on its TDLR filing.

Scope of Work

Sitework and (2) new shell building construction to be leased to multiple tenants. Each tenant lease space is to be permitted under separate permit.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

9320 & 9330 HIGHWAY 6, Missouri City, TX, 77459

Location by street address

Watch all construction in 77459 (Missouri City)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Missouri City?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.