Project intelligenceTDLR TABS2023009748Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Hardening at Bowie Elementary in Lubbock, TX

2902 Chicago Ave, Lubbock, TX, 79407

Construction complete · Aug 2023Project Closed

Hardening at Bowie Elementary is a renovation/alteration project at 2902 Chicago Ave, Lubbock, in Lubbock County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2023). The project has an estimated value of $100K across about 1,000 sq ft.

Estimated project value
$100K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$100/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 19, 2023194 days across supplied datesAug 1, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    133 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    61 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79407 (Lubbock)

One email per change. Unsubscribe in one click. Privacy.

Hardening at Bowie Elementary is a Renovation/Alteration project located at 2902 Chicago Ave, Lubbock, TX 79407 in Lubbock, Texas. The project has an estimated value of $100K covering 1,000 sq ft. Lubbock Independent School DIstrict is the property owner and BGR Architects, Inc. is the design firm of record. The project was registered with TDLR on January 19, 2023.

Frequently Asked Questions

What is Hardening at Bowie Elementary?

Hardening at Bowie Elementary is a renovation/alteration project at 2902 Chicago Ave in Lubbock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Renovations

Is Hardening at Bowie Elementary open in Lubbock?

Construction on Hardening at Bowie Elementary is complete — TDLR records show the project passed its required accessibility inspection in Aug 2023. The building is finished and very likely open.

Where is Hardening at Bowie Elementary located?

Hardening at Bowie Elementary is located at 2902 Chicago Ave, Lubbock, TX, 79407, in Lubbock County.

Who is the owner or developer of Hardening at Bowie Elementary?

Lubbock Independent School DIstrict is the property owner/developer of record for Hardening at Bowie Elementary, per its TDLR project registration.

Who is the architect or design firm for Hardening at Bowie Elementary?

BGR Architects, Inc. is the design firm of record for Hardening at Bowie Elementary, according to its TDLR filing.

How much does Hardening at Bowie Elementary cost and how big is it?

Hardening at Bowie Elementary has an estimated construction value of $100K and approximately 1,000 square feet (about $100/sqft), based on its TDLR filing.

Scope of Work

Interior Renovations

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2902 Chicago Ave, Lubbock, TX, 79407

Location by street address

Watch all construction in 79407 (Lubbock)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.