This project is privately funded, on private land for private use.

Atkore Office Improvement - Phase 1 in Dallas, TX

4949 Joseph Hardin Drive, Dallas, TX, 75236

Target date passed (May 2023)Review Complete

Atkore Office Improvement - Phase 1 is a renovation/alteration project at 4949 Joseph Hardin Drive, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish May 2023 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $600K across about 16,000 sq ft.

Estimated project value
$600K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
16,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$38/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 19, 2023132 days across supplied datesMay 31, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    18 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    114 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75236 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

Atkore Office Improvement - Phase 1 is a Renovation/Alteration project located at 4949 Joseph Hardin Drive, Dallas, TX 75236 in Dallas, Texas. The project has an estimated value of $600K covering 16,000 sq ft. Atkore is the property owner and Entos Design is the design firm of record. The project was registered with TDLR on January 19, 2023.

Frequently Asked Questions

What is Atkore Office Improvement - Phase 1?

Atkore Office Improvement - Phase 1 is a renovation/alteration project at 4949 Joseph Hardin Drive in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of office space including: finishes, layout revisions, new doors and glazing element. Restrooms, locker rooms, and Break areas are revised and to be all new. Project is to be completed in two phases. Warehouse is not…

Is Atkore Office Improvement - Phase 1 open in Dallas?

Atkore Office Improvement - Phase 1 was scheduled to finish construction in May 2023 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Atkore Office Improvement - Phase 1 located?

Atkore Office Improvement - Phase 1 is located at 4949 Joseph Hardin Drive, Dallas, TX, 75236, in Dallas County.

Who is the owner or developer of Atkore Office Improvement - Phase 1?

Atkore is the property owner/developer of record for Atkore Office Improvement - Phase 1, per its TDLR project registration.

Who is the architect or design firm for Atkore Office Improvement - Phase 1?

Entos Design is the design firm of record for Atkore Office Improvement - Phase 1, according to its TDLR filing.

How much does Atkore Office Improvement - Phase 1 cost and how big is it?

Atkore Office Improvement - Phase 1 has an estimated construction value of $600K and approximately 16,000 square feet (about $38/sqft), based on its TDLR filing.

Scope of Work

Interior renovation of office space including: finishes, layout revisions, new doors and glazing element. Restrooms, locker rooms, and Break areas are revised and to be all new. Project is to be completed in two phases. Warehouse is not in scope.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4949 Joseph Hardin Drive, Dallas, TX, 75236

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75236 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.