Funding type
This project is privately funded, on private land for private use.
Central Methodist United Church Interior Renovations in Galveston, TX
3308 Avenue O 1/2, Galveston, TX, 77550
Central Methodist United Church Interior Renovations is a renovation/alteration project at 3308 Avenue O 1/2, Galveston, in Galveston County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Oct 2023 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $125K across about 4,280 sq ft.
- Estimated project value
- $125K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 4,280 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $29/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
68 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
183 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77550 (Galveston)
One email per change. Unsubscribe in one click. Privacy.
Central Methodist United Church Interior Renovations is a Renovation/Alteration project located at 3308 Avenue O 1/2, Galveston, TX 77550 in Galveston, Texas. The project has an estimated value of $125K covering 4,280 sq ft. CENTRAL METHODIST CHURCH is the property owner and Cobalt Engineering is the design firm of record. The project was registered with TDLR on January 23, 2023.
Frequently Asked Questions
What is Central Methodist United Church Interior Renovations?
Central Methodist United Church Interior Renovations is a renovation/alteration project at 3308 Avenue O 1/2 in Galveston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Within the existing building, the client is adding a shower room, updating the restroom for ADA, adding a bike repair room and adding a restroom in the kitchen area.
Is Central Methodist United Church Interior Renovations open in Galveston?
Central Methodist United Church Interior Renovations was scheduled to finish construction in Oct 2023 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Central Methodist United Church Interior Renovations located?
Central Methodist United Church Interior Renovations is located at 3308 Avenue O 1/2, Galveston, TX, 77550, in Galveston County.
Who is the owner or developer of Central Methodist United Church Interior Renovations?
CENTRAL METHODIST CHURCH is the property owner/developer of record for Central Methodist United Church Interior Renovations, per its TDLR project registration.
Who is the architect or design firm for Central Methodist United Church Interior Renovations?
Cobalt Engineering is the design firm of record for Central Methodist United Church Interior Renovations, according to its TDLR filing.
How much does Central Methodist United Church Interior Renovations cost and how big is it?
Central Methodist United Church Interior Renovations has an estimated construction value of $125K and approximately 4,280 square feet (about $29/sqft), based on its TDLR filing.
Scope of Work
Within the existing building, the client is adding a shower room, updating the restroom for ADA, adding a bike repair room and adding a restroom in the kitchen area.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
3308 Avenue O 1/2, Galveston, TX, 77550
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$235K totalSame Design Firm
$43.4M totalWatch all construction in 77550 (Galveston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Galveston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.