Pine Trails Subdivision Drainage Improvements- 2018 Section 3 and 4 is a renovation/alteration project at Generally bound by Clay Road to the south State Hwy 6 to the West, Addicks Satsuma Road to the N, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2024). The project has an estimated value of $1.3M across about 122,778 sq ft.
Final inspection completed, awaiting project closure
Pine Trails Subdivision Drainage Improvements- 2018 Section 3 and 4 is a Renovation/Alteration project located at Generally bound by Clay Road to the south State Hwy 6 to the West, Addicks Satsuma Road to the N, Houston, TX 77049 in Houston, Texas. The project has an estimated value of $1.3M covering 122,778 sq ft. Harris County is the property owner and Cobb, Fendley & Associates is the design firm of record. The project was registered with TDLR on February 13, 2023.
Pine Trails Subdivision Drainage Improvements- 2018 Section 3 and 4 is a renovation/alteration project at Generally bound by Clay Road to the south State Hwy 6 to the West, Addicks Satsuma Road to the N in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Install about 15,000 feet of new storm sewer pipe, replace approximately 3 miles of concrete roads, replace sidewalk and curb ramps, construct a new detention pond.
Construction on Pine Trails Subdivision Drainage Improvements- 2018 Section 3 and 4 is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2024. The building is finished and very likely open.
Pine Trails Subdivision Drainage Improvements- 2018 Section 3 and 4 is located at Generally bound by Clay Road to the south State Hwy 6 to the West, Addicks Satsuma Road to the N, Houston, TX, 77049, in Harris County.
Harris County is the property owner/developer of record for Pine Trails Subdivision Drainage Improvements- 2018 Section 3 and 4, per its TDLR project registration.
Cobb, Fendley & Associates is the design firm of record for Pine Trails Subdivision Drainage Improvements- 2018 Section 3 and 4, according to its TDLR filing.
Pine Trails Subdivision Drainage Improvements- 2018 Section 3 and 4 has an estimated construction value of $1.3M and approximately 122,778 square feet (about $10/sqft), based on its TDLR filing.
Install about 15,000 feet of new storm sewer pipe, replace approximately 3 miles of concrete roads, replace sidewalk and curb ramps, construct a new detention pond.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Feb 13, 2023
Review Complete
Inspection Complete
Nov 13, 2024
Closed