Project intelligenceTDLR TABS2023011921New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Traffic Signal Improvements (CSJ: 0178-01-042, etc.) in Houston, TX

Various Locations, Houston, TX, 77075

Target date passed (Dec 2024)Review Complete

Traffic Signal Improvements (CSJ: 0178-01-042, etc.) is a new construction project at Various Locations, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Dec 2024 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $86K across about 945 sq ft.

Estimated project value
$86K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
945 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$91/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
11 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 15, 2023656 days across supplied datesDec 2, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    321 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    335 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77075 (Houston)

One email per change. Unsubscribe in one click. Privacy.

Traffic Signal Improvements (CSJ: 0178-01-042, etc.) is a New Construction project located at Various Locations, Houston, TX 77075 in Houston, Texas. The project has an estimated value of $86K covering 945 sq ft. TxDOT District: Houston is the property owner. The project was registered with TDLR on February 15, 2023.

Frequently Asked Questions

What is Traffic Signal Improvements (CSJ: 0178-01-042, etc.)?

Traffic Signal Improvements (CSJ: 0178-01-042, etc.) is a new construction project at Various Locations in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Signal Improvements consisting of proposed mast arm signal poles with luminaires and loops detection. Upgrade pedestrian elements. Design to City of Houston standards.

Is Traffic Signal Improvements (CSJ: 0178-01-042, etc.) open in Houston?

Traffic Signal Improvements (CSJ: 0178-01-042, etc.) was scheduled to finish construction in Dec 2024 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Traffic Signal Improvements (CSJ: 0178-01-042, etc.) located?

Traffic Signal Improvements (CSJ: 0178-01-042, etc.) is located at Various Locations, Houston, TX, 77075, in Harris County.

Who is the owner or developer of Traffic Signal Improvements (CSJ: 0178-01-042, etc.)?

TxDOT District: Houston is the property owner/developer of record for Traffic Signal Improvements (CSJ: 0178-01-042, etc.), per its TDLR project registration.

How much does Traffic Signal Improvements (CSJ: 0178-01-042, etc.) cost and how big is it?

Traffic Signal Improvements (CSJ: 0178-01-042, etc.) has an estimated construction value of $86K and approximately 945 square feet (about $91/sqft), based on its TDLR filing.

Scope of Work

Signal Improvements consisting of proposed mast arm signal poles with luminaires and loops detection. Upgrade pedestrian elements. Design to City of Houston standards.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Various Locations, Houston, TX, 77075

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77075 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.