Project intelligenceTDLR TABS2023012746Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

TCE Second Floor Renovations - Phase 2 in Houston, TX

2803 Buffalo Speedway, Houston, TX, 77098

Construction complete · Sep 2023Project Closed

TCE Second Floor Renovations - Phase 2 is a renovation/alteration project at 2803 Buffalo Speedway, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2023). The project has an estimated value of $550K across about 7,145 sq ft.

Estimated project value
$550K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
7,145 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$77/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 27, 2023200 days across supplied datesSep 15, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    47 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    153 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77098 (Houston)

One email per change. Unsubscribe in one click. Privacy.

TCE Second Floor Renovations - Phase 2 is a Renovation/Alteration project located at 2803 Buffalo Speedway, Houston, TX 77098 in Houston, Texas. The project has an estimated value of $550K covering 7,145 sq ft. Texas Crude Energy LLC is the property owner and Synchro is the design firm of record. The project was registered with TDLR on February 27, 2023.

Frequently Asked Questions

What is TCE Second Floor Renovations - Phase 2?

TCE Second Floor Renovations - Phase 2 is a renovation/alteration project at 2803 Buffalo Speedway in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Partial remodel of second floor. Majority will be mechanical work.

Is TCE Second Floor Renovations - Phase 2 open in Houston?

Construction on TCE Second Floor Renovations - Phase 2 is complete — TDLR records show the project passed its required accessibility inspection in Sep 2023. The building is finished and very likely open.

Where is TCE Second Floor Renovations - Phase 2 located?

TCE Second Floor Renovations - Phase 2 is located at 2803 Buffalo Speedway, Houston, TX, 77098, in Harris County.

Who is the owner or developer of TCE Second Floor Renovations - Phase 2?

Texas Crude Energy LLC is the property owner/developer of record for TCE Second Floor Renovations - Phase 2, per its TDLR project registration.

Who is the architect or design firm for TCE Second Floor Renovations - Phase 2?

Synchro is the design firm of record for TCE Second Floor Renovations - Phase 2, according to its TDLR filing.

How much does TCE Second Floor Renovations - Phase 2 cost and how big is it?

TCE Second Floor Renovations - Phase 2 has an estimated construction value of $550K and approximately 7,145 square feet (about $77/sqft), based on its TDLR filing.

Scope of Work

Partial remodel of second floor. Majority will be mechanical work.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2803 Buffalo Speedway, Houston, TX, 77098

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77098 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.