Project intelligenceTDLR TABS2023012788Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Toilet Renovations for Lubbock High School

2004 - 19th Street, Lubbock, TX, 79401

Construction complete · Oct 2023Project Closed

Toilet Renovations for Lubbock High School is a renovation/alteration project at 2004 - 19th Street, Lubbock, in Lubbock County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2023). The project has an estimated value of $200K across about 522 sq ft.

Estimated project value
$200K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
522 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$383/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 27, 2023246 days across supplied datesOct 31, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    92 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    154 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79401 (Lubbock)

One email per change. Unsubscribe in one click. Privacy.

Toilet Renovations for Lubbock High School is a Renovation/Alteration project located at 2004 - 19th Street, Lubbock, TX 79401 in Lubbock, Texas. The project has an estimated value of $200K covering 522 sq ft. Lubbock Independent School District is the property owner and Stiles, Wallace & Associates is the design firm of record. The project was registered with TDLR on February 27, 2023.

Frequently Asked Questions

What is Toilet Renovations for Lubbock High School?

Toilet Renovations for Lubbock High School is a renovation/alteration project at 2004 - 19th Street in Lubbock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing first floor toilet inside Lubbock High School. Work to include removal and/or reconfiguration of toilet components to include toilet fixtures, toilet partitions, drywall partitions, doors, ceilings and light fixtures.

Is Toilet Renovations for Lubbock High School open in Lubbock?

Construction on Toilet Renovations for Lubbock High School is complete — TDLR records show the project passed its required accessibility inspection in Oct 2023. The building is finished and very likely open.

Where is Toilet Renovations for Lubbock High School located?

Toilet Renovations for Lubbock High School is located at 2004 - 19th Street, Lubbock, TX, 79401, in Lubbock County.

Who is the owner or developer of Toilet Renovations for Lubbock High School?

Lubbock Independent School District is the property owner/developer of record for Toilet Renovations for Lubbock High School, per its TDLR project registration.

Who is the architect or design firm for Toilet Renovations for Lubbock High School?

Stiles, Wallace & Associates is the design firm of record for Toilet Renovations for Lubbock High School, according to its TDLR filing.

How much does Toilet Renovations for Lubbock High School cost and how big is it?

Toilet Renovations for Lubbock High School has an estimated construction value of $200K and approximately 522 square feet (about $383/sqft), based on its TDLR filing.

Scope of Work

Renovation of existing first floor toilet inside Lubbock High School. Work to include removal and/or reconfiguration of toilet components to include toilet fixtures, toilet partitions, drywall partitions, doors, ceilings and light fixtures.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2004 - 19th Street, Lubbock, TX, 79401

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 79401 (Lubbock)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.