Project intelligenceTDLR TABS2023013786New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Calhoun County Boggy Bayou Nature Park Improvements Phase 1

3rd St, Port O Connor, TX, 78982

Construction complete · Apr 2023Project Closed

Calhoun County Boggy Bayou Nature Park Improvements Phase 1 is a new construction project at 3rd St, Port O Connor, in Calhoun County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2023). The project has an estimated value of $96K across about 490 sq ft.

Estimated project value
$96K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
490 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$196/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 14, 202373 days across supplied datesApr 28, 2023

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    24 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    49 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78982 (Port O Connor)

One email per change. Unsubscribe in one click. Privacy.

Calhoun County Boggy Bayou Nature Park Improvements Phase 1 is a New Construction project located at 3rd St, Port O Connor, TX 78982 in Port O Connor, Texas. The project has an estimated value of $96K covering 490 sq ft. Calhoun County - Pct 4 is the property owner and Urban Engineering is the design firm of record. The project was registered with TDLR on March 10, 2023.

Frequently Asked Questions

What is Calhoun County Boggy Bayou Nature Park Improvements Phase 1?

Calhoun County Boggy Bayou Nature Park Improvements Phase 1 is a new construction project at 3rd St in Port O Connor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of approximately 2,000 linear feet of bollard fencing along park road & other areas to protect sensitive vegetation, enlargement of the boardwalk terminus to 20' X 15', & an ADA ramp.

Is Calhoun County Boggy Bayou Nature Park Improvements Phase 1 open in Port O Connor?

Construction on Calhoun County Boggy Bayou Nature Park Improvements Phase 1 is complete — TDLR records show the project passed its required accessibility inspection in Apr 2023. The building is finished and very likely open.

Where is Calhoun County Boggy Bayou Nature Park Improvements Phase 1 located?

Calhoun County Boggy Bayou Nature Park Improvements Phase 1 is located at 3rd St, Port O Connor, TX, 78982, in Calhoun County.

Who is the owner or developer of Calhoun County Boggy Bayou Nature Park Improvements Phase 1?

Calhoun County - Pct 4 is the property owner/developer of record for Calhoun County Boggy Bayou Nature Park Improvements Phase 1, per its TDLR project registration.

Who is the architect or design firm for Calhoun County Boggy Bayou Nature Park Improvements Phase 1?

Urban Engineering is the design firm of record for Calhoun County Boggy Bayou Nature Park Improvements Phase 1, according to its TDLR filing.

How much does Calhoun County Boggy Bayou Nature Park Improvements Phase 1 cost and how big is it?

Calhoun County Boggy Bayou Nature Park Improvements Phase 1 has an estimated construction value of $96K and approximately 490 square feet (about $196/sqft), based on its TDLR filing.

Scope of Work

Construction of approximately 2,000 linear feet of bollard fencing along park road & other areas to protect sensitive vegetation, enlargement of the boardwalk terminus to 20' X 15', & an ADA ramp.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3rd St, Port O Connor, TX, 78982

Location by street address

Watch all construction in 78982 (Port O Connor)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Port O Connor?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.