Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Clint Independent School District Mountain View High School Site Improvements in El Paso, TX
14964 Gregg Dr., El Paso, TX, 79912
Clint Independent School District Mountain View High School Site Improvements is a new construction project at 14964 Gregg Dr., El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2026). The project has an estimated value of $6.0M across about 6,066 sq ft.
- Estimated project value
- $6.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 6,066 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $989/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 4mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
92 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
827 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
114 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Clint Independent School District Mountain View High School Site Improvements
The Clint Independent School District completed site improvements at Mountain View High School in El Paso, a project that TDLR closed the project file for in January 2026. This new construction effort, registered in March 2023, involved a $6,000,000 investment to upgrade the campus infrastructure. The work officially finished with a final inspection passed in October 2025, marking the end of the accessibility review process.
Located at 14964 Gregg Dr., El Paso, TX 79912, the project focused on various site improvements across the Mountain View High School campus. The scope included the construction of a new parking lot with a dedicated bus lane, the relocation of athletic equipment, and extensive landscaping. These developments were designed to connect all site amenities with four new buildings, creating a more integrated and functional school environment.
Project Scale and Design
Mijares-Mora Architects served as the design firm of record for this initiative, which covered a total area of 6,066 sq ft. The estimated cost of $6,000,000 translates to $989 per square foot, a figure significantly above the El Paso County median of $111 per sq ft for new construction filings. The scheduled build window of 827 days was also longer than the county median of 214 days, reflecting the complexity of coordinating site works with existing school operations.
Clint Independent School District, the owner of record, has previously registered other projects with TDLR, including a $4,000,000 transportation facility improvement in Horizon City. Mijares-Mora Architects has been involved in several other notable projects in the region, such as the First Light Federal Credit Union Admin Offices and the UTEP Central Library. The registered accessibility specialist for this specific filing was Eckhard K Fennig, ensuring compliance with Texas accessibility standards throughout the construction phase.
The project utilized public funds and public land, aligning with federal requirements for such infrastructure developments. The final status of the project is closed, with all inspections completed and the file officially terminated by the Texas Department of Licensing and Regulation. This completion allows the district to utilize the new parking, landscaping, and connected amenities for the benefit of students and staff.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79912 (El Paso)
One email per change. Unsubscribe in one click. Privacy.
Clint Independent School District Mountain View High School Site Improvements is a New Construction project located at 14964 Gregg Dr., El Paso, TX 79912 in El Paso, Texas. The project has an estimated value of $6.0M covering 6,066 sq ft. Clint Independent School Disctrict is the property owner and Mijares-Mora Architects is the design firm of record. The project was registered with TDLR on March 27, 2023.
Frequently Asked Questions
Is the project finished?
Yes, the final inspection passed in October 2025, and TDLR closed the project file in January 2026, marking the end of the review process.
What was the total cost?
The estimated cost for the site improvements at Mountain View High School was $6,000,000, as stated in the TDLR filing.
Who designed the project?
Mijares-Mora Architects was the design firm of record for this construction project in El Paso County.
What specific improvements were made?
Work included a new parking lot with a bus lane, athletic equipment relocation, and landscaping to connect four new buildings.
What is Clint Independent School District Mountain View High School Site Improvements?
Clint Independent School District Mountain View High School Site Improvements is a new construction project at 14964 Gregg Dr. in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Various site improvements to be done in the MVHS campus, such as new parking lot with a dedicated bus lane, relocation of athletic equipment, as well as landscaping and site developments to connect all site ammenities with 4 new buildings.
Is Clint Independent School District Mountain View High School Site Improvements open in El Paso?
Construction on Clint Independent School District Mountain View High School Site Improvements is complete — TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.
Where is Clint Independent School District Mountain View High School Site Improvements located?
Clint Independent School District Mountain View High School Site Improvements is located at 14964 Gregg Dr., El Paso, TX, 79912, in El Paso County.
Who is the owner or developer of Clint Independent School District Mountain View High School Site Improvements?
Clint Independent School Disctrict is the property owner/developer of record for Clint Independent School District Mountain View High School Site Improvements, per its TDLR project registration.
Who is the architect or design firm for Clint Independent School District Mountain View High School Site Improvements?
Mijares-Mora Architects is the design firm of record for Clint Independent School District Mountain View High School Site Improvements, according to its TDLR filing.
How much does Clint Independent School District Mountain View High School Site Improvements cost and how big is it?
Clint Independent School District Mountain View High School Site Improvements has an estimated construction value of $6.0M and approximately 6,066 square feet (about $989/sqft), based on its TDLR filing.
Scope of Work
Various site improvements to be done in the MVHS campus, such as new parking lot with a dedicated bus lane, relocation of athletic equipment, as well as landscaping and site developments to connect all site ammenities with 4 new buildings.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
14964 Gregg Dr., El Paso, TX, 79912
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$67.1M totalWatch all construction in 79912 (El Paso)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in El Paso?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.