Project has been completed and closed
Dunn and Chadwick Clinic Expansion is a Additions to Existing Building project located at 216 Rock Hill Dr 901 FM 1187 East, Crowley, TX 76036 in Crowley, Texas. The project has an estimated value of $1.5M covering 7,070 sq ft. Texas Health Huguley Hospital is the property owner and GUIDE ARCHITECTURE LLC is the design firm of record. The project was registered with TDLR on March 29, 2023.
Dunn and Chadwick Clinic Expansion is a additions to existing building project at 216 Rock Hill Dr 901 FM 1187 East, Crowley, TX 76036 in Crowley, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Project includes an approximately 3,860 sf addition to and renovations of an approximately 3,680 sf a single story wood framed medical facility (doctor office).
Construction on Dunn and Chadwick Clinic Expansion is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2025. The building is finished and very likely open.
Dunn and Chadwick Clinic Expansion is located at 216 Rock Hill Dr 901 FM 1187 East, Crowley, TX 76036, Crowley, TX, 76036, in Tarrant County.
Texas Health Huguley Hospital is the property owner/developer of record for Dunn and Chadwick Clinic Expansion, per its TDLR project registration.
GUIDE ARCHITECTURE LLC is the design firm of record for Dunn and Chadwick Clinic Expansion, according to its TDLR filing.
Dunn and Chadwick Clinic Expansion has an estimated construction value of $1.5M and approximately 7,070 square feet (about $212/sqft), based on its TDLR filing.
Project includes an approximately 3,860 sf addition to and renovations of an approximately 3,680 sf a single story wood framed medical facility (doctor office).
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Mar 29, 2023
Review Complete
Inspection Complete
Closed
Apr 30, 2025