ALL-ENERGY
ALL-ENERGY is a renovation/alteration project at 5847 SAN FELIPE STEET, LEVEL 20, SUITE 2020, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $150K across about 3,177 sq ft.
๐Project Metrics
TDLR #TABS2023015405Review Complete
Design review complete, construction may proceed
ALL-ENERGY is a Renovation/Alteration project located at 5847 SAN FELIPE STEET, LEVEL 20, SUITE 2020, Houston, TX 77057 in Houston, Texas. The project has an estimated value of $150K covering 3,177 sq ft. PARKWAY PROPERTIES is the property owner and ZIEGLER COOPER is the design firm of record. The project was registered with TDLR on March 30, 2023.
โFrequently Asked Questions
What is ALL-ENERGY?
ALL-ENERGY is a renovation/alteration project at 5847 SAN FELIPE STEET, LEVEL 20, SUITE 2020 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: RENOVATION TO EXISTING SUITE
Is ALL-ENERGY open in Houston?
ALL-ENERGY is currently under construction in Houston, TX. Its current TDLR status is "Review Complete".
Where is ALL-ENERGY located?
ALL-ENERGY is located at 5847 SAN FELIPE STEET, LEVEL 20, SUITE 2020, Houston, TX, 77057, in Harris County.
Who is the owner or developer of ALL-ENERGY?
PARKWAY PROPERTIES is the property owner/developer of record for ALL-ENERGY, per its TDLR project registration.
Who is the architect or design firm for ALL-ENERGY?
ZIEGLER COOPER is the design firm of record for ALL-ENERGY, according to its TDLR filing.
How much does ALL-ENERGY cost and how big is it?
ALL-ENERGY has an estimated construction value of $150K and approximately 3,177 square feet (about $47/sqft), based on its TDLR filing.
๐Scope of Work
RENOVATION TO EXISTING SUITE
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 30, 2023
Review Complete
Mar 30, 2023
Inspection Complete
Closed