Funding type
This project is privately funded, on private land for private use.
Liberty Village Subdivision, Phase 3 in Brenham, TX
Blue Bell Road And State highway 36, Brenham, TX, 77833
Liberty Village Subdivision, Phase 3 is a new construction project at Blue Bell Road And State highway 36, Brenham, in Washington County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2023). The project has an estimated value of $300K across about 10,000 sq ft.
- Estimated project value
- $300K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 10,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $30/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 7 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
185 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
22 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77833 (Brenham)
One email per change. Unsubscribe in one click. Privacy.
Liberty Village Subdivision, Phase 3 is a New Construction project located at Blue Bell Road And State highway 36, Brenham, TX 77833 in Brenham, Texas. The project has an estimated value of $300K covering 10,000 sq ft. Continental Homes of Texas is the property owner. The project was registered with TDLR on April 6, 2023.
Frequently Asked Questions
What is Liberty Village Subdivision, Phase 3?
Liberty Village Subdivision, Phase 3 is a new construction project at Blue Bell Road And State highway 36 in Brenham, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of a new section of an existing subdivision, sidewalks, curb ramps and crosswalks.
Is Liberty Village Subdivision, Phase 3 open in Brenham?
Construction on Liberty Village Subdivision, Phase 3 is complete — TDLR records show the project passed its required accessibility inspection in Apr 2023. The building is finished and very likely open.
Where is Liberty Village Subdivision, Phase 3 located?
Liberty Village Subdivision, Phase 3 is located at Blue Bell Road And State highway 36, Brenham, TX, 77833, in Washington County.
Who is the owner or developer of Liberty Village Subdivision, Phase 3?
Continental Homes of Texas is the property owner/developer of record for Liberty Village Subdivision, Phase 3, per its TDLR project registration.
How much does Liberty Village Subdivision, Phase 3 cost and how big is it?
Liberty Village Subdivision, Phase 3 has an estimated construction value of $300K and approximately 10,000 square feet (about $30/sqft), based on its TDLR filing.
Scope of Work
Construction of a new section of an existing subdivision, sidewalks, curb ramps and crosswalks.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Blue Bell Road And State highway 36, Brenham, TX, 77833
Related Projects
Same Owner
$74.5M totalWatch all construction in 77833 (Brenham)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Brenham?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.