Project intelligenceTDLR TABS2023016511New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Ingram High School New Band Hall

644 Hwy 39, Ingram, TX, 78025

Construction complete · Aug 2026Project Closed

Ingram High School New Band Hall is a new construction project at 644 Hwy 39, Ingram, in Kerr County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $2.6M across about 7,000 sq ft.

Estimated project value
$2.6M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
7,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$371/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 13, 20231,209 days across supplied datesAug 4, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    4 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    151 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  5. Project closed · TDLR filing

    The project record was closed in TDLR.

    1,054 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78025 (Ingram)

One email per change. Unsubscribe in one click. Privacy.

Ingram High School New Band Hall is a New Construction project located at 644 Hwy 39, Ingram, TX 78025 in Ingram, Texas. The project has an estimated value of $2.6M covering 7,000 sq ft. Ingram Independent School District is the property owner and Alvarado Architects & Associates, Inc. is the design firm of record. The project was registered with TDLR on April 13, 2023.

Frequently Asked Questions

What is Ingram High School New Band Hall?

Ingram High School New Band Hall is a new construction project at 644 Hwy 39 in Ingram, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The construction of a new 7,000 square feet Band Hall with practice rooms, instrument and uniform storage, ensemble rooms, office, restrooms, and auxiliary spaces.

Is Ingram High School New Band Hall open in Ingram?

Construction on Ingram High School New Band Hall is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is Ingram High School New Band Hall located?

Ingram High School New Band Hall is located at 644 Hwy 39, Ingram, TX, 78025, in Kerr County.

Who is the owner or developer of Ingram High School New Band Hall?

Ingram Independent School District is the property owner/developer of record for Ingram High School New Band Hall, per its TDLR project registration.

Who is the architect or design firm for Ingram High School New Band Hall?

Alvarado Architects & Associates, Inc. is the design firm of record for Ingram High School New Band Hall, according to its TDLR filing.

How much does Ingram High School New Band Hall cost and how big is it?

Ingram High School New Band Hall has an estimated construction value of $2.6M and approximately 7,000 square feet (about $371/sqft), based on its TDLR filing.

Scope of Work

The construction of a new 7,000 square feet Band Hall with practice rooms, instrument and uniform storage, ensemble rooms, office, restrooms, and auxiliary spaces.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

644 Hwy 39, Ingram, TX, 78025

Location by street address

Watch all construction in 78025 (Ingram)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.