Suite 1000
Suite 1000 is a renovation/alteration project at 8 Greenway Plaza, Floor 10, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2024). The project has an estimated value of $329K across about 6,581 sq ft.
๐Project Metrics
TDLR #TABS2023016984Project Closed
Project has been completed and closed
Suite 1000 is a Renovation/Alteration project located at 8 Greenway Plaza, Floor 10, Houston, TX 77046 in Houston, Texas. The project has an estimated value of $329K covering 6,581 sq ft. GWP Eight Twelve LLC is the property owner and Lamoureux Associates Inc is the design firm of record. The project was registered with TDLR on April 19, 2023.
โFrequently Asked Questions
What is Suite 1000?
Suite 1000 is a renovation/alteration project at 8 Greenway Plaza, Floor 10 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Office remodel
Is Suite 1000 open in Houston?
Construction on Suite 1000 is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2024. The building is finished and very likely open.
Where is Suite 1000 located?
Suite 1000 is located at 8 Greenway Plaza, Floor 10, Houston, TX, 77046, in Harris County.
Who is the owner or developer of Suite 1000?
GWP Eight Twelve LLC is the property owner/developer of record for Suite 1000, per its TDLR project registration.
Who is the architect or design firm for Suite 1000?
Lamoureux Associates Inc is the design firm of record for Suite 1000, according to its TDLR filing.
How much does Suite 1000 cost and how big is it?
Suite 1000 has an estimated construction value of $329K and approximately 6,581 square feet (about $50/sqft), based on its TDLR filing.
๐Scope of Work
Office remodel
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 19, 2023
Review Complete
Inspection Complete
Closed
Aug 31, 2024