Industrial Finishout Phase 2
Industrial Finishout Phase 2 is a renovation/alteration project at 6101 Campus Dr. Suite #140, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $500K across about 49,000 sq ft.
๐Project Metrics
TDLR #TABS2023017018Review Complete
Design review complete, construction may proceed
Industrial Finishout Phase 2 is a Renovation/Alteration project located at 6101 Campus Dr. Suite #140, Fort Worth, TX 76104 in Fort Worth, Texas. The project has an estimated value of $500K covering 49,000 sq ft. Nuveen Real Estate is the property owner and MEL/ARCH Studio is the design firm of record. The project was registered with TDLR on April 19, 2023.
โFrequently Asked Questions
What is Industrial Finishout Phase 2?
Industrial Finishout Phase 2 is a renovation/alteration project at 6101 Campus Dr. Suite #140 in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Finish out of industrial operations.
Is Industrial Finishout Phase 2 open in Fort Worth?
Industrial Finishout Phase 2 is currently under construction in Fort Worth, TX. Its current TDLR status is "Review Complete".
Where is Industrial Finishout Phase 2 located?
Industrial Finishout Phase 2 is located at 6101 Campus Dr. Suite #140, Fort Worth, TX, 76104, in Tarrant County.
Who is the owner or developer of Industrial Finishout Phase 2?
Nuveen Real Estate is the property owner/developer of record for Industrial Finishout Phase 2, per its TDLR project registration.
Who is the architect or design firm for Industrial Finishout Phase 2?
MEL/ARCH Studio is the design firm of record for Industrial Finishout Phase 2, according to its TDLR filing.
How much does Industrial Finishout Phase 2 cost and how big is it?
Industrial Finishout Phase 2 has an estimated construction value of $500K and approximately 49,000 square feet (about $10/sqft), based on its TDLR filing.
๐Scope of Work
Finish out of industrial operations.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 19, 2023
Review Complete
Apr 19, 2023
Inspection Complete
Closed