High School Stair Replacement at Devine ISD
1225 W. Hondo Ave., Devine, TX, 78016
High School Stair Replacement at Devine ISD is a renovation/alteration project at 1225 W. Hondo Ave., Devine, in Medina County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Nov 2023 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $300K across about 1,400 sq ft.
- Estimated project value
- $300K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,400 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $214/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
42 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
182 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78016 (Devine)
One email per change. Unsubscribe in one click. Privacy.
High School Stair Replacement at Devine ISD is a Renovation/Alteration project located at 1225 W. Hondo Ave., Devine, TX 78016 in Devine, Texas. The project has an estimated value of $300K covering 1,400 sq ft. Devine ISD is the property owner and KNRG Architects is the design firm of record. The project was registered with TDLR on April 20, 2023.
Frequently Asked Questions
What is High School Stair Replacement at Devine ISD?
High School Stair Replacement at Devine ISD is a renovation/alteration project at 1225 W. Hondo Ave. in Devine, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Demolition of existing concrete steps and flatwork, including retainer walls, railings, planters, etc. Replace with new steps, railings, retainer walls, flatwork, misc. landscape/drainage.
Is High School Stair Replacement at Devine ISD open in Devine?
High School Stair Replacement at Devine ISD was scheduled to finish construction in Nov 2023 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is High School Stair Replacement at Devine ISD located?
High School Stair Replacement at Devine ISD is located at 1225 W. Hondo Ave., Devine, TX, 78016, in Medina County.
Who is the owner or developer of High School Stair Replacement at Devine ISD?
Devine ISD is the property owner/developer of record for High School Stair Replacement at Devine ISD, per its TDLR project registration.
Who is the architect or design firm for High School Stair Replacement at Devine ISD?
KNRG Architects is the design firm of record for High School Stair Replacement at Devine ISD, according to its TDLR filing.
How much does High School Stair Replacement at Devine ISD cost and how big is it?
High School Stair Replacement at Devine ISD has an estimated construction value of $300K and approximately 1,400 square feet (about $214/sqft), based on its TDLR filing.
Scope of Work
Demolition of existing concrete steps and flatwork, including retainer walls, railings, planters, etc. Replace with new steps, railings, retainer walls, flatwork, misc. landscape/drainage.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1225 W. Hondo Ave., Devine, TX, 78016
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 78016 (Devine)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Devine?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.