Project intelligenceTDLR TABS2023017131New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Klein Cain High School Addition

10201 Spring Cypress Rd., Klein, TX, 77477

Construction complete · Jul 2024Inspection Complete

Klein Cain High School Addition is a new construction project at 10201 Spring Cypress Rd., Klein, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2024). The project has an estimated value of $14.0M across about 40,000 sq ft.

Estimated project value
$14.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
40,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$350/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 20, 2023468 days across supplied datesJul 31, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    74 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    394 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77477 (Klein)

One email per change. Unsubscribe in one click. Privacy.

Klein Cain High School Addition is a New Construction project located at 10201 Spring Cypress Rd., Klein, TX 77477 in Klein, Texas. The project has an estimated value of $14.0M covering 40,000 sq ft. Klein Independent School District is the property owner and Smith & Company Architects is the design firm of record. The project was registered with TDLR on April 20, 2023.

Frequently Asked Questions

What is Klein Cain High School Addition?

Klein Cain High School Addition is a new construction project at 10201 Spring Cypress Rd. in Klein, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: THE CAIN HIGH SCHOOL ADDITION PROJECT CONSISTS OF 2 NEW CLASSROOM BUILDING ADDITIONS THAT WILL BE CONNECTED TO AREA’S F & J OF THE EXISTING CAIN HIGH SCHOOL. EACH NEW 2 STORY ADDITION WILL BE APPROXIMATELY 20,000 SF TOTALING APPROXIMATEL…

Is Klein Cain High School Addition open in Klein?

Construction on Klein Cain High School Addition is complete — TDLR records show the project passed its required accessibility inspection in Jul 2024. The building is finished and very likely open.

Where is Klein Cain High School Addition located?

Klein Cain High School Addition is located at 10201 Spring Cypress Rd., Klein, TX, 77477, in Harris County.

Who is the owner or developer of Klein Cain High School Addition?

Klein Independent School District is the property owner/developer of record for Klein Cain High School Addition, per its TDLR project registration.

Who is the architect or design firm for Klein Cain High School Addition?

Smith & Company Architects is the design firm of record for Klein Cain High School Addition, according to its TDLR filing.

How much does Klein Cain High School Addition cost and how big is it?

Klein Cain High School Addition has an estimated construction value of $14.0M and approximately 40,000 square feet (about $350/sqft), based on its TDLR filing.

Scope of Work

THE CAIN HIGH SCHOOL ADDITION PROJECT CONSISTS OF 2 NEW CLASSROOM BUILDING ADDITIONS THAT WILL BE CONNECTED TO AREA’S F & J OF THE EXISTING CAIN HIGH SCHOOL. EACH NEW 2 STORY ADDITION WILL BE APPROXIMATELY 20,000 SF TOTALING APPROXIMATELY 40,000 SF.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

10201 Spring Cypress Rd., Klein, TX, 77477

Location by street address

Watch all construction in 77477 (Klein)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.