Funding type
This project is privately funded, on private land for private use.
Hearne ISD High School Wood Field
1407 Cedar Street, Hearne, TX, 77859
Hearne ISD High School Wood Field is a renovation/alteration project at 1407 Cedar Street, Hearne, in Robertson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2023). The project has an estimated value of $3.0M across about 130,000 sq ft.
- Estimated project value
- $3.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 130,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $23/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
77 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
133 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77859 (Hearne)
One email per change. Unsubscribe in one click. Privacy.
Hearne ISD High School Wood Field is a Renovation/Alteration project located at 1407 Cedar Street, Hearne, TX 77859 in Hearne, Texas. The project has an estimated value of $3.0M covering 130,000 sq ft. Hearne ISD is the property owner and Sports Fields, Inc. is the design firm of record. The project was registered with TDLR on April 28, 2023.
Frequently Asked Questions
What is Hearne ISD High School Wood Field?
Hearne ISD High School Wood Field is a renovation/alteration project at 1407 Cedar Street in Hearne, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of high school athletic field. Conversion to synthetic turf. Renovation of running track and field events.
Is Hearne ISD High School Wood Field open in Hearne?
Construction on Hearne ISD High School Wood Field is complete — TDLR records show the project passed its required accessibility inspection in Nov 2023. The building is finished and very likely open.
Where is Hearne ISD High School Wood Field located?
Hearne ISD High School Wood Field is located at 1407 Cedar Street, Hearne, TX, 77859, in Robertson County.
Who is the owner or developer of Hearne ISD High School Wood Field?
Hearne ISD is the property owner/developer of record for Hearne ISD High School Wood Field, per its TDLR project registration.
Who is the architect or design firm for Hearne ISD High School Wood Field?
Sports Fields, Inc. is the design firm of record for Hearne ISD High School Wood Field, according to its TDLR filing.
How much does Hearne ISD High School Wood Field cost and how big is it?
Hearne ISD High School Wood Field has an estimated construction value of $3.0M and approximately 130,000 square feet (about $23/sqft), based on its TDLR filing.
Scope of Work
Renovation of high school athletic field. Conversion to synthetic turf. Renovation of running track and field events.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1407 Cedar Street, Hearne, TX, 77859
Related Projects
Watch all construction in 77859 (Hearne)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Hearne?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.