Project intelligenceTDLR TABS2023018369Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

MD Anderson 1MC Restack Phase 2

7007 Bertner Ave., Houston, TX, 77030

Construction complete · May 2026Project Closed

MD Anderson 1MC Restack Phase 2 is a renovation/alteration project at 7007 Bertner Ave., Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $1.2M across about 30,056 sq ft.

Estimated project value
$1.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
30,056 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$40/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 9mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 4, 20231,099 days across supplied datesMay 7, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    64 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    634 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    363 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    38 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77030 (Houston)

One email per change. Unsubscribe in one click. Privacy.

MD Anderson 1MC Restack Phase 2 is a Renovation/Alteration project located at 7007 Bertner Ave., Houston, TX 77030 in Houston, Texas. The project has an estimated value of $1.2M covering 30,056 sq ft. The University of Texas MD Anderson Cancer Center is the property owner and HOK Houston is the design firm of record. The project was registered with TDLR on May 4, 2023.

Frequently Asked Questions

What is MD Anderson 1MC Restack Phase 2?

MD Anderson 1MC Restack Phase 2 is a renovation/alteration project at 7007 Bertner Ave. in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Minor interior renovations including; demolition, new/relocated doors and card readers, power/voice/data devices, fire alarm devises and the patching/repairing of existing finishes

Is MD Anderson 1MC Restack Phase 2 open in Houston?

Construction on MD Anderson 1MC Restack Phase 2 is complete — TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.

Where is MD Anderson 1MC Restack Phase 2 located?

MD Anderson 1MC Restack Phase 2 is located at 7007 Bertner Ave., Houston, TX, 77030, in Harris County.

Who is the owner or developer of MD Anderson 1MC Restack Phase 2?

The University of Texas MD Anderson Cancer Center is the property owner/developer of record for MD Anderson 1MC Restack Phase 2, per its TDLR project registration.

Who is the architect or design firm for MD Anderson 1MC Restack Phase 2?

HOK Houston is the design firm of record for MD Anderson 1MC Restack Phase 2, according to its TDLR filing.

How much does MD Anderson 1MC Restack Phase 2 cost and how big is it?

MD Anderson 1MC Restack Phase 2 has an estimated construction value of $1.2M and approximately 30,056 square feet (about $40/sqft), based on its TDLR filing.

Scope of Work

Minor interior renovations including; demolition, new/relocated doors and card readers, power/voice/data devices, fire alarm devises and the patching/repairing of existing finishes

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

7007 Bertner Ave., Houston, TX, 77030

Location by street address

Watch all construction in 77030 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.