Restroom renovation
Restroom renovation is a renovation/alteration project at 7127 Bee Cave Rd., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2023). The project has an estimated value of $100K across about 650 sq ft.
๐Project Metrics
TDLR #TABS2023018436Project Closed
Project has been completed and closed
Restroom renovation is a Renovation/Alteration project located at 7127 Bee Cave Rd., Austin, TX 78746 in Austin, Texas. The project has an estimated value of $100K covering 650 sq ft. Westlake Hills Presbyterian church is the property owner and FGM architects is the design firm of record. The project was registered with TDLR on May 5, 2023.
โFrequently Asked Questions
What is Restroom renovation?
Restroom renovation is a renovation/alteration project at 7127 Bee Cave Rd. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: renovation and reconfiguration of noncompliant restrooms.
Is Restroom renovation open in Austin?
Construction on Restroom renovation is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2023. The building is finished and very likely open.
Where is Restroom renovation located?
Restroom renovation is located at 7127 Bee Cave Rd., Austin, TX, 78746, in Travis County.
Who is the owner or developer of Restroom renovation?
Westlake Hills Presbyterian church is the property owner/developer of record for Restroom renovation, per its TDLR project registration.
Who is the architect or design firm for Restroom renovation?
FGM architects is the design firm of record for Restroom renovation, according to its TDLR filing.
How much does Restroom renovation cost and how big is it?
Restroom renovation has an estimated construction value of $100K and approximately 650 square feet (about $154/sqft), based on its TDLR filing.
๐Scope of Work
renovation and reconfiguration of noncompliant restrooms.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 5, 2023
Review Complete
Inspection Complete
Closed
Dec 1, 2023
๐Related Projects
๐๏ธSame Design Firm
$2.4M total๐Related City Permits
Building permits found at or near this location
Express: Repairs to due fire damage
Install separate 1 inch uponor water line Install 1/4 turn shut off at unit Install meter box at each valve Install tracer wire for each water line Bed down pipe with sand
Express: Repairs to due fire damage
Express: Repairs to due fire damage
Tee into external gas line and run additional line for generator installation