Project intelligenceTDLR TABS2023018848Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Fishing Pier Replacement

Park Road 33, Caddo, TX, 76429

Construction complete · Oct 2024Project Closed

Fishing Pier Replacement is a renovation/alteration project at Park Road 33, Caddo, in Palo Pinto County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2024). The project has an estimated value of $202K across about 26,800 sq ft.

Estimated project value
$202K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
26,800 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$8/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 10, 2023510 days across supplied datesOct 1, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    144 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    366 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76429 (Caddo)

One email per change. Unsubscribe in one click. Privacy.

Fishing Pier Replacement is a Renovation/Alteration project located at Park Road 33, Caddo, TX 76429 in Caddo, Texas. The project has an estimated value of $202K covering 26,800 sq ft. Texas Parks & Wildlife Department is the property owner and Texas Parks & Wildlife Department is the design firm of record. The project was registered with TDLR on May 10, 2023.

Frequently Asked Questions

What is Fishing Pier Replacement?

Fishing Pier Replacement is a renovation/alteration project at Park Road 33 in Caddo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace fishing pier, provide accessible parking space, construct accessible concrete walks, and accessible fishing cleaning table

Is Fishing Pier Replacement open in Caddo?

Construction on Fishing Pier Replacement is complete — TDLR records show the project passed its required accessibility inspection in Oct 2024. The building is finished and very likely open.

Where is Fishing Pier Replacement located?

Fishing Pier Replacement is located at Park Road 33, Caddo, TX, 76429, in Palo Pinto County.

Who is the owner or developer of Fishing Pier Replacement?

Texas Parks & Wildlife Department is the property owner/developer of record for Fishing Pier Replacement, per its TDLR project registration.

Who is the architect or design firm for Fishing Pier Replacement?

Texas Parks & Wildlife Department is the design firm of record for Fishing Pier Replacement, according to its TDLR filing.

How much does Fishing Pier Replacement cost and how big is it?

Fishing Pier Replacement has an estimated construction value of $202K and approximately 26,800 square feet (about $8/sqft), based on its TDLR filing.

Scope of Work

Replace fishing pier, provide accessible parking space, construct accessible concrete walks, and accessible fishing cleaning table

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Park Road 33, Caddo, TX, 76429

32.72130, -98.66565

Watch all construction in 76429 (Caddo)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.