Cornerstone High School Sitework & Utilities in San Antonio, TX
TBD, San Antonio, TX, 78257
Cornerstone High School Sitework & Utilities is a new construction project at TBD, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $13.8M across about 83 sq ft.
- Estimated project value
- $13.8M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 83 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $166.27K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 3mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
9 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
821 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78257 (San Antonio)
One email per change. Unsubscribe in one click. Privacy.
Cornerstone High School Sitework & Utilities is a New Construction project located at TBD, San Antonio, TX 78257 in San Antonio, Texas. The project has an estimated value of $13.8M covering 83 sq ft. Global Evangelism, Inc. / Norman Trail is the property owner and Pfluger Architects is the design firm of record. The project was registered with TDLR on May 23, 2023.
Frequently Asked Questions
What is Cornerstone High School Sitework & Utilities?
Cornerstone High School Sitework & Utilities is a new construction project at TBD in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Site Excavation & Grading including all underfloor, buildings pad prep, sports fields subgrades, Erosion Control, and Asphalt Paving.
Is Cornerstone High School Sitework & Utilities open in San Antonio?
Cornerstone High School Sitework & Utilities was scheduled to finish construction in Aug 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Cornerstone High School Sitework & Utilities located?
Cornerstone High School Sitework & Utilities is located at TBD, San Antonio, TX, 78257, in Bexar County.
Who is the owner or developer of Cornerstone High School Sitework & Utilities?
Global Evangelism, Inc. / Norman Trail is the property owner/developer of record for Cornerstone High School Sitework & Utilities, per its TDLR project registration.
Who is the architect or design firm for Cornerstone High School Sitework & Utilities?
Pfluger Architects is the design firm of record for Cornerstone High School Sitework & Utilities, according to its TDLR filing.
How much does Cornerstone High School Sitework & Utilities cost and how big is it?
Cornerstone High School Sitework & Utilities has an estimated construction value of $13.8M and approximately 83 square feet (about $166.27K/sqft), based on its TDLR filing.
Scope of Work
Site Excavation & Grading including all underfloor, buildings pad prep, sports fields subgrades, Erosion Control, and Asphalt Paving.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
TBD, San Antonio, TX, 78257
Watch all construction in 78257 (San Antonio)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in San Antonio?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.