Project intelligenceTDLR TABS2023019993New Construction
Funding type

This project is privately funded, on private land for private use.

Campo del Sol Phase 2B in El Paso, TX

Preston Foster Blvd. at Desert Calico Ave., El Paso, TX, 79924

Target date passed (Jun 2025)Review Complete

Campo del Sol Phase 2B is a new construction project at Preston Foster Blvd. at Desert Calico Ave., El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $2.8M across about 260,000 sq ft.

Estimated project value
$2.8M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
260,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$11/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 10mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 25, 2023752 days across supplied datesJun 15, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    95 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    657 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79924 (El Paso)

One email per change. Unsubscribe in one click. Privacy.

Campo del Sol Phase 2B is a New Construction project located at Preston Foster Blvd. at Desert Calico Ave., El Paso, TX 79924 in El Paso, Texas. The project has an estimated value of $2.8M covering 260,000 sq ft. Franklin Mountain Estates, LP is the property owner and Huitt-Zollars, Inc. is the design firm of record. The project was registered with TDLR on May 25, 2023.

Frequently Asked Questions

What is Campo del Sol Phase 2B?

Campo del Sol Phase 2B is a new construction project at Preston Foster Blvd. at Desert Calico Ave. in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Park pavilions, playground, picnic area, soccer field, trails, sidewalks, signage, landscape, irrigation

Is Campo del Sol Phase 2B open in El Paso?

Campo del Sol Phase 2B was scheduled to finish construction in Jun 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Campo del Sol Phase 2B located?

Campo del Sol Phase 2B is located at Preston Foster Blvd. at Desert Calico Ave., El Paso, TX, 79924, in El Paso County.

Who is the owner or developer of Campo del Sol Phase 2B?

Franklin Mountain Estates, LP is the property owner/developer of record for Campo del Sol Phase 2B, per its TDLR project registration.

Who is the architect or design firm for Campo del Sol Phase 2B?

Huitt-Zollars, Inc. is the design firm of record for Campo del Sol Phase 2B, according to its TDLR filing.

How much does Campo del Sol Phase 2B cost and how big is it?

Campo del Sol Phase 2B has an estimated construction value of $2.8M and approximately 260,000 square feet (about $11/sqft), based on its TDLR filing.

Scope of Work

Park pavilions, playground, picnic area, soccer field, trails, sidewalks, signage, landscape, irrigation

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Preston Foster Blvd. at Desert Calico Ave., El Paso, TX, 79924

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 79924 (El Paso)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.