Project intelligenceTDLR TABS2023020268New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Cotton Bayou Waste Water Treatment Plant in Mont Belvieu, TX

3811 Perry Ave, Mont Belvieu, TX, 77523

Construction complete · Oct 2024Project Closed

Cotton Bayou Waste Water Treatment Plant is a new construction project at 3811 Perry Ave, Mont Belvieu, in Chambers County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2024). The project has an estimated value of $1.6M across about 2,164 sq ft.

Estimated project value
$1.6M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
2,164 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$739/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 30, 2023496 days across supplied datesOct 7, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    251 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    245 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77523 (Mont Belvieu)

One email per change. Unsubscribe in one click. Privacy.

Cotton Bayou Waste Water Treatment Plant is a New Construction project located at 3811 Perry Ave, Mont Belvieu, TX 77523 in Mont Belvieu, Texas. The project has an estimated value of $1.6M covering 2,164 sq ft. City of Mont Belvieu is the property owner and H2B, INC. is the design firm of record. The project was registered with TDLR on May 30, 2023.

Frequently Asked Questions

What is Cotton Bayou Waste Water Treatment Plant?

Cotton Bayou Waste Water Treatment Plant is a new construction project at 3811 Perry Ave in Mont Belvieu, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: NEW ELECTRICAL BUILDING (1378 GSF) AND NEW CHEMICAL BUILDING(427 GSF) WITH A OPEN PRE-ENGINEERED METAL CANOPY TO COVER EQUIPMENT (359 GSF).

Is Cotton Bayou Waste Water Treatment Plant open in Mont Belvieu?

Construction on Cotton Bayou Waste Water Treatment Plant is complete — TDLR records show the project passed its required accessibility inspection in Oct 2024. The building is finished and very likely open.

Where is Cotton Bayou Waste Water Treatment Plant located?

Cotton Bayou Waste Water Treatment Plant is located at 3811 Perry Ave, Mont Belvieu, TX, 77523, in Chambers County.

Who is the owner or developer of Cotton Bayou Waste Water Treatment Plant?

City of Mont Belvieu is the property owner/developer of record for Cotton Bayou Waste Water Treatment Plant, per its TDLR project registration.

Who is the architect or design firm for Cotton Bayou Waste Water Treatment Plant?

H2B, INC. is the design firm of record for Cotton Bayou Waste Water Treatment Plant, according to its TDLR filing.

How much does Cotton Bayou Waste Water Treatment Plant cost and how big is it?

Cotton Bayou Waste Water Treatment Plant has an estimated construction value of $1.6M and approximately 2,164 square feet (about $739/sqft), based on its TDLR filing.

Scope of Work

NEW ELECTRICAL BUILDING (1378 GSF) AND NEW CHEMICAL BUILDING(427 GSF) WITH A OPEN PRE-ENGINEERED METAL CANOPY TO COVER EQUIPMENT (359 GSF).

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3811 Perry Ave, Mont Belvieu, TX, 77523

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77523 (Mont Belvieu)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Mont Belvieu?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.