DELL RR2W-1 5G Phase 2 is a renovation/alteration project at 501 Dell Way, Round Rock, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2024). The project has an estimated value of $5.0M across about 3,240 sq ft.
๐Project Metrics
TDLR #TABS2023020309Project Closed
Project has been completed and closed
DELL RR2W-1 5G Phase 2 is a Renovation/Alteration project located at 501 Dell Way, Round Rock, TX 78664 in Round Rock, Texas. The project has an estimated value of $5.0M covering 3,240 sq ft. Dell Technologies is the property owner and Cushing terrell is the design firm of record. The project was registered with TDLR on May 31, 2023.
โFrequently Asked Questions
What is DELL RR2W-1 5G Phase 2?
DELL RR2W-1 5G Phase 2 is a renovation/alteration project at 501 Dell Way in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Server Rack Lab
Is DELL RR2W-1 5G Phase 2 open in Round Rock?
Construction on DELL RR2W-1 5G Phase 2 is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2024. The building is finished and very likely open.
Where is DELL RR2W-1 5G Phase 2 located?
DELL RR2W-1 5G Phase 2 is located at 501 Dell Way, Round Rock, TX, 78664, in Williamson County.
Who is the owner or developer of DELL RR2W-1 5G Phase 2?
Dell Technologies is the property owner/developer of record for DELL RR2W-1 5G Phase 2, per its TDLR project registration.
Who is the architect or design firm for DELL RR2W-1 5G Phase 2?
Cushing terrell is the design firm of record for DELL RR2W-1 5G Phase 2, according to its TDLR filing.
How much does DELL RR2W-1 5G Phase 2 cost and how big is it?
DELL RR2W-1 5G Phase 2 has an estimated construction value of $5.0M and approximately 3,240 square feet (about $1.54K/sqft), based on its TDLR filing.
๐Scope of Work
New Server Rack Lab
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 31, 2023
Review Complete
Inspection Complete
Closed
Sep 30, 2024
๐Related Projects
๐คSame Owner
$16.3M total๐Related City Permits
Building permits found at or near this location
Change of Use - Interior alteration of an existing office space into a golf simulator recreation establishment.
200-amp overhead service rebuild
EPLAN - Structural Modification for future tenant - NOT FOR OCCUPANCY - 1st Floor
San Luis 1512-J-R New 2-Story Single Family Residence with (4) bedrooms (3) bathrooms Attached Garage Covered Patio & Porch Cafe & Game Room
Cap off water & wastewater Total demo of duplex 2200 sq ft circa 1966 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage. ***