Funding type
This project is privately funded, on private land for private use.
HARBOR FREIGHT TOOLS - TENANT IMPROVEMENT in Sweetwater, TX
608 E BRODWAY AVE, Sweetwater, TX, 79556
HARBOR FREIGHT TOOLS - TENANT IMPROVEMENT is a renovation/alteration project at 608 E BRODWAY AVE, Sweetwater, in Nolan County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2024). The project has an estimated value of $1.2M across about 16,623 sq ft.
- Estimated project value
- $1.2M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 16,623 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $74/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
175 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
71 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79556 (Sweetwater)
One email per change. Unsubscribe in one click. Privacy.
HARBOR FREIGHT TOOLS - TENANT IMPROVEMENT is a Renovation/Alteration project located at 608 E BRODWAY AVE, Sweetwater, TX 79556 in Sweetwater, Texas. The project has an estimated value of $1.2M covering 16,623 sq ft. JEFF WARWICK is the property owner and ADA ARCHITECTS is the design firm of record. The project was registered with TDLR on July 10, 2023.
Frequently Asked Questions
What is HARBOR FREIGHT TOOLS - TENANT IMPROVEMENT?
HARBOR FREIGHT TOOLS - TENANT IMPROVEMENT is a renovation/alteration project at 608 E BRODWAY AVE in Sweetwater, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INT & EXT ALTERATIONS OF A VACANT SPACE TO A NEW HFT RETAIL STORE. EXT ALT INCLUDE A NEW CONCRETE FORKLIFT PAD AT GRADE, NEW OVERHEAD RECEIVING DOOR & 2 NEW EGRESS DOORS, NEW CONCRETE CURB RAMP & BOLLARDS, NEW AUTO BI-PARTING ENTRY/EXIT…
Is HARBOR FREIGHT TOOLS - TENANT IMPROVEMENT open in Sweetwater?
Construction on HARBOR FREIGHT TOOLS - TENANT IMPROVEMENT is complete — TDLR records show the project passed its required accessibility inspection in Mar 2024. The building is finished and very likely open.
Where is HARBOR FREIGHT TOOLS - TENANT IMPROVEMENT located?
HARBOR FREIGHT TOOLS - TENANT IMPROVEMENT is located at 608 E BRODWAY AVE, Sweetwater, TX, 79556, in Nolan County.
Who is the owner or developer of HARBOR FREIGHT TOOLS - TENANT IMPROVEMENT?
JEFF WARWICK is the property owner/developer of record for HARBOR FREIGHT TOOLS - TENANT IMPROVEMENT, per its TDLR project registration.
Who is the architect or design firm for HARBOR FREIGHT TOOLS - TENANT IMPROVEMENT?
ADA ARCHITECTS is the design firm of record for HARBOR FREIGHT TOOLS - TENANT IMPROVEMENT, according to its TDLR filing.
How much does HARBOR FREIGHT TOOLS - TENANT IMPROVEMENT cost and how big is it?
HARBOR FREIGHT TOOLS - TENANT IMPROVEMENT has an estimated construction value of $1.2M and approximately 16,623 square feet (about $74/sqft), based on its TDLR filing.
Scope of Work
INT & EXT ALTERATIONS OF A VACANT SPACE TO A NEW HFT RETAIL STORE. EXT ALT INCLUDE A NEW CONCRETE FORKLIFT PAD AT GRADE, NEW OVERHEAD RECEIVING DOOR & 2 NEW EGRESS DOORS, NEW CONCRETE CURB RAMP & BOLLARDS, NEW AUTO BI-PARTING ENTRY/EXIT DOORS
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
608 E BRODWAY AVE, Sweetwater, TX, 79556
Related Projects
Nearby Projects
Within 0.6 miWatch all construction in 79556 (Sweetwater)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Sweetwater?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.