๐Ÿ“Review Complete๐Ÿ—๏ธ New Construction๐Ÿ’ต This project is privately funded, on private land for private use.

Castlewood Mixed-Use

109 Wesley Miller Lane, Taylor, TX 76574, Taylor, TX, 76574
Construction50%

๐Ÿ“ŠProject Metrics

TDLR #TABS2023023799
$24.0M
Project Value
153,000
Square Feet
$157/sqft
Cost/SqFt
1y 4mo
Duration
Registered:Jul 17, 2023
Start:Aug 1, 2023
Target:Dec 1, 2024
๐Ÿ“

Review Complete

Design review complete, construction may proceed

๐Ÿ“‹Scope of Work

he project is a five-story Type III-A wood framed mixed-use building and surface parking lot. The building contains 126 dwelling units, 7 live/work units, a ground-floor commercial space and resident-serving amenity spaces. The surface lot contacts 1

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
July 17, 2023
Review Complete
July 17, 2023
Construction Start
August 1, 2023
Expected Completion
December 1, 2024

๐Ÿ“„Related City Permits

Building permits found at or near this location

10900 SAGE OAK CV

Installation of a 200A Service-Rated Automatic Transfer Switch 22kW whole home generator additional grounding and type 2 surge protection.

ActiveElectrical PermitRepairFeb 2026
View Details
2026-019952 EP
๐Ÿ”งNomic Energy LLC DBA Nomic Power Solutions
10901 CATTHORN CV

(Reason George) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP

ActiveElectrical PermitSpecial Inspections ProgramFeb 2026
View Details
2026-018139 EP
๐Ÿ”งSMART CHARGE RESIDENTAL LLC
10902 CUT PLAINS LOOP

Install Level 2 EV Charger

FinalElectrical PermitSpecial Inspections ProgramFeb 2026
View Details
2026-017415 EP
๐Ÿ”งCharge Pro LLC
10901 N LAMAR BLVD BLDG A

Tis is a commercial shopping center one of the strips has a transformer that feeds a 36 x36 jbox with tap blocks inside. there are 6 meter banks that have feeder from the tap blocks to each meter then there respective disconnects. One of the A phase has melted insulation due to overload or deterioation of the insulation. This is an emergency requuest due to if the bare phase touches any metal parts and arc fault explosion can take place the likelyhood is high. Please approve this request high priority. I will have to coordinate with Autin Energy to do after hrs. Time sensitive. High danger.

ActiveElectrical PermitRepairFeb 2026
View Details
2026-015956 EP
๐Ÿ”งElectric Contractors LLC
10906 WAREHAM CT

Replacement of an existing water heater replacing an existing 40 gallon gas water heater like for like

FinalPlumbing PermitChange OutFeb 2026
View Details
2026-015381 PP
๐Ÿ”งBenjamin Franklin Plumbing