HMH OPC 17 373 CT Replacement
HMH OPC 17 373 CT Replacement is a renovation/alteration project at 6445 Main Street, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2023). The project has an estimated value of $175K across about 686 sq ft.
๐Project Metrics
TDLR #TABS2023023905Project Closed
Project has been completed and closed
HMH OPC 17 373 CT Replacement is a Renovation/Alteration project located at 6445 Main Street, Houston, TX 77030 in Houston, Texas. The project has an estimated value of $175K covering 686 sq ft. Houston Methodist Hospital is the property owner and C/V Architects is the design firm of record. The project was registered with TDLR on July 18, 2023.
โFrequently Asked Questions
What is HMH OPC 17 373 CT Replacement?
HMH OPC 17 373 CT Replacement is a renovation/alteration project at 6445 Main Street in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Equipment Replacement of Procedure Room 373 located in the Methodist Outpatient Center (OPC) Level 17.
Is HMH OPC 17 373 CT Replacement open in Houston?
Construction on HMH OPC 17 373 CT Replacement is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2023. The building is finished and very likely open.
Where is HMH OPC 17 373 CT Replacement located?
HMH OPC 17 373 CT Replacement is located at 6445 Main Street, Houston, TX, 77030, in Harris County.
Who is the owner or developer of HMH OPC 17 373 CT Replacement?
Houston Methodist Hospital is the property owner/developer of record for HMH OPC 17 373 CT Replacement, per its TDLR project registration.
Who is the architect or design firm for HMH OPC 17 373 CT Replacement?
C/V Architects is the design firm of record for HMH OPC 17 373 CT Replacement, according to its TDLR filing.
How much does HMH OPC 17 373 CT Replacement cost and how big is it?
HMH OPC 17 373 CT Replacement has an estimated construction value of $175K and approximately 686 square feet (about $255/sqft), based on its TDLR filing.
๐Scope of Work
Equipment Replacement of Procedure Room 373 located in the Methodist Outpatient Center (OPC) Level 17.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 18, 2023
Review Complete
Inspection Complete
Closed
Oct 20, 2023