UTRWD
UTRWD is a renovation/alteration project at 802 N Kealy Ave, Lewisville, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2024). The project has an estimated value of $1.2M across about 3,173 sq ft.
๐Project Metrics
TDLR #TABS2023026432Project Closed
Project has been completed and closed
UTRWD is a Renovation/Alteration project located at 802 N Kealy Ave, Lewisville, TX 75057 in Lewisville, Texas. The project has an estimated value of $1.2M covering 3,173 sq ft. Upper Trinity Regional Water District is the property owner and WILLIAM PECK ASSOC INC is the design firm of record. The project was registered with TDLR on August 22, 2023.
โFrequently Asked Questions
What is UTRWD?
UTRWD is a renovation/alteration project at 802 N Kealy Ave in Lewisville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel existing space in existing office
Is UTRWD open in Lewisville?
Construction on UTRWD is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2024. The building is finished and very likely open.
Where is UTRWD located?
UTRWD is located at 802 N Kealy Ave, Lewisville, TX, 75057, in Denton County.
Who is the owner or developer of UTRWD?
Upper Trinity Regional Water District is the property owner/developer of record for UTRWD, per its TDLR project registration.
Who is the architect or design firm for UTRWD?
WILLIAM PECK ASSOC INC is the design firm of record for UTRWD, according to its TDLR filing.
How much does UTRWD cost and how big is it?
UTRWD has an estimated construction value of $1.2M and approximately 3,173 square feet (about $378/sqft), based on its TDLR filing.
๐Scope of Work
Remodel existing space in existing office
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 22, 2023
Review Complete
Inspection Complete
Closed
Nov 22, 2024