Atosa, USA
Atosa, USA is a renovation/alteration project at 11330 TANYARD CREEK DR. suite 4, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2024). The project has an estimated value of $350K across about 65,206 sq ft.
๐Project Metrics
TDLR #TABS2023026935Project Closed
Project has been completed and closed
Atosa, USA is a Renovation/Alteration project located at 11330 TANYARD CREEK DR. suite 4, Houston, TX 77040 in Houston, Texas. The project has an estimated value of $350K covering 65,206 sq ft. Hillwood is the property owner and Lo Architecture is the design firm of record. The project was registered with TDLR on August 28, 2023.
โFrequently Asked Questions
What is Atosa, USA?
Atosa, USA is a renovation/alteration project at 11330 TANYARD CREEK DR. suite 4 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Buildout in an existing building
Is Atosa, USA open in Houston?
Construction on Atosa, USA is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2024. The building is finished and very likely open.
Where is Atosa, USA located?
Atosa, USA is located at 11330 TANYARD CREEK DR. suite 4, Houston, TX, 77040, in Harris County.
Who is the owner or developer of Atosa, USA?
Hillwood is the property owner/developer of record for Atosa, USA, per its TDLR project registration.
Who is the architect or design firm for Atosa, USA?
Lo Architecture is the design firm of record for Atosa, USA, according to its TDLR filing.
How much does Atosa, USA cost and how big is it?
Atosa, USA has an estimated construction value of $350K and approximately 65,206 square feet (about $5/sqft), based on its TDLR filing.
๐Scope of Work
Interior Buildout in an existing building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 28, 2023
Review Complete
Inspection Complete
Closed
Mar 31, 2024