Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Border Highway Shared Use Path: in El Paso, TX
HWY West, from Doniphan Dr. to Executive Blvd., El Paso, TX, 79912
Border Highway Shared Use Path: is a new construction project at HWY West, from Doniphan Dr. to Executive Blvd., El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2026). The project has an estimated value of $870K across about 37,898 sq ft.
- Estimated project value
- $870K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 37,898 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $23/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
337 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
177 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
399 days after the preceding date shown.
Source: TDLR filing
View source record
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79912 (El Paso)
One email per change. Unsubscribe in one click. Privacy.
Border Highway Shared Use Path: is a New Construction project located at HWY West, from Doniphan Dr. to Executive Blvd., El Paso, TX 79912 in El Paso, Texas. The project has an estimated value of $870K covering 37,898 sq ft. City of El Paso - Capital Improvement Department is the property owner and DEC - El Paso, LLC is the design firm of record. The project was registered with TDLR on August 30, 2023.
Frequently Asked Questions
What is Border Highway Shared Use Path:?
Border Highway Shared Use Path: is a new construction project at HWY West, from Doniphan Dr. to Executive Blvd. in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of an 11-foot shared use path with signage, ADA curb ramps and safe crossings at intersections.
Is Border Highway Shared Use Path: open in El Paso?
Construction on Border Highway Shared Use Path: is complete — TDLR records show the project passed its required accessibility inspection in Feb 2026. The building is finished and very likely open.
Where is Border Highway Shared Use Path: located?
Border Highway Shared Use Path: is located at HWY West, from Doniphan Dr. to Executive Blvd., El Paso, TX, 79912, in El Paso County.
Who is the owner or developer of Border Highway Shared Use Path:?
City of El Paso - Capital Improvement Department is the property owner/developer of record for Border Highway Shared Use Path:, per its TDLR project registration.
Who is the architect or design firm for Border Highway Shared Use Path:?
DEC - El Paso, LLC is the design firm of record for Border Highway Shared Use Path:, according to its TDLR filing.
How much does Border Highway Shared Use Path: cost and how big is it?
Border Highway Shared Use Path: has an estimated construction value of $870K and approximately 37,898 square feet (about $23/sqft), based on its TDLR filing.
Scope of Work
Construction of an 11-foot shared use path with signage, ADA curb ramps and safe crossings at intersections.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
HWY West, from Doniphan Dr. to Executive Blvd., El Paso, TX, 79912
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$1.11B totalWatch all construction in 79912 (El Paso)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in El Paso?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.