Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
E. 13th Avenue Sidewalk Improvements
E. 13th Avenue from Waco Road to Main Street, Belton, TX, 76513
E. 13th Avenue Sidewalk Improvements is a new construction project at E. 13th Avenue from Waco Road to Main Street, Belton, in Bell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2024). The project has an estimated value of $605K across about 11,880 sq ft.
- Estimated project value
- $605K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 11,880 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $51/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
116 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
181 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76513 (Belton)
One email per change. Unsubscribe in one click. Privacy.
E. 13th Avenue Sidewalk Improvements is a New Construction project located at E. 13th Avenue from Waco Road to Main Street, Belton, TX 76513 in Belton, Texas. The project has an estimated value of $605K covering 11,880 sq ft. City of Belton is the property owner and Kasberg, Patrick, & Associates, LP is the design firm of record. The project was registered with TDLR on September 7, 2023.
Frequently Asked Questions
What is E. 13th Avenue Sidewalk Improvements?
E. 13th Avenue Sidewalk Improvements is a new construction project at E. 13th Avenue from Waco Road to Main Street in Belton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remove and replace existing sidewalk on south side of E. 13th Avenue. Replace with new 4-foot wide sidewalk, including curb ramps at intersections and striping for bike lane.
Is E. 13th Avenue Sidewalk Improvements open in Belton?
Construction on E. 13th Avenue Sidewalk Improvements is complete — TDLR records show the project passed its required accessibility inspection in Jun 2024. The building is finished and very likely open.
Where is E. 13th Avenue Sidewalk Improvements located?
E. 13th Avenue Sidewalk Improvements is located at E. 13th Avenue from Waco Road to Main Street, Belton, TX, 76513, in Bell County.
Who is the owner or developer of E. 13th Avenue Sidewalk Improvements?
City of Belton is the property owner/developer of record for E. 13th Avenue Sidewalk Improvements, per its TDLR project registration.
Who is the architect or design firm for E. 13th Avenue Sidewalk Improvements?
Kasberg, Patrick, & Associates, LP is the design firm of record for E. 13th Avenue Sidewalk Improvements, according to its TDLR filing.
How much does E. 13th Avenue Sidewalk Improvements cost and how big is it?
E. 13th Avenue Sidewalk Improvements has an estimated construction value of $605K and approximately 11,880 square feet (about $51/sqft), based on its TDLR filing.
Scope of Work
Remove and replace existing sidewalk on south side of E. 13th Avenue. Replace with new 4-foot wide sidewalk, including curb ramps at intersections and striping for bike lane.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
E. 13th Avenue from Waco Road to Main Street, Belton, TX, 76513
Related Projects
Same Owner
$10.6M totalWatch all construction in 76513 (Belton)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Belton?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.