Construction complete · Aug 2024Project Closed

Sampson Elementary School Renovations is a renovation/alteration project at 16002 Coles Crossing Dr. N, Cypress, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2024). The project has an estimated value of $7.1M across about 99,475 sq ft.

Estimated project value
$7.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
99,475 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$71/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 7, 2023329 days across supplied datesAug 1, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    260 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    69 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77429 (Cypress)

One email per change. Unsubscribe in one click. Privacy.

Sampson Elementary School Renovations is a Renovation/Alteration project located at 16002 Coles Crossing Dr. N, Cypress, TX 77429 in Cypress, Texas. The project has an estimated value of $7.1M covering 99,475 sq ft. Cypress Fairbanks Independent School District is the property owner and Joiner Architects is the design firm of record. The project was registered with TDLR on September 7, 2023.

Frequently Asked Questions

What is Sampson Elementary School Renovations?

Sampson Elementary School Renovations is a renovation/alteration project at 16002 Coles Crossing Dr. N in Cypress, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Security Upgrades throughout campus HVAC Upgrades Lockdown Buttons Power and Data renovations

Is Sampson Elementary School Renovations open in Cypress?

Construction on Sampson Elementary School Renovations is complete — TDLR records show the project passed its required accessibility inspection in Aug 2024. The building is finished and very likely open.

Where is Sampson Elementary School Renovations located?

Sampson Elementary School Renovations is located at 16002 Coles Crossing Dr. N, Cypress, TX, 77429, in Harris County.

Who is the owner or developer of Sampson Elementary School Renovations?

Cypress Fairbanks Independent School District is the property owner/developer of record for Sampson Elementary School Renovations, per its TDLR project registration.

Who is the architect or design firm for Sampson Elementary School Renovations?

Joiner Architects is the design firm of record for Sampson Elementary School Renovations, according to its TDLR filing.

How much does Sampson Elementary School Renovations cost and how big is it?

Sampson Elementary School Renovations has an estimated construction value of $7.1M and approximately 99,475 square feet (about $71/sqft), based on its TDLR filing.

Scope of Work

Security Upgrades throughout campus HVAC Upgrades Lockdown Buttons Power and Data renovations

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

16002 Coles Crossing Dr. N, Cypress, TX, 77429

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77429 (Cypress)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.