Project intelligenceTDLR TABS2024001629New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Dallas Water Utilities Service Center

12000 Greenville Ave 1500 Marilla St, Dallas, TX, 75204

Target date passed (Feb 2026)Review Complete

Dallas Water Utilities Service Center is a new construction project at 12000 Greenville Ave 1500 Marilla St, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Feb 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $24.5M across about 26,260 sq ft.

Estimated project value
$24.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
26,260 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$932/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 5mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 25, 2023868 days across supplied datesFeb 9, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    357 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    511 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75204 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

Dallas Water Utilities Service Center is a New Construction project located at 12000 Greenville Ave 1500 Marilla St, Dallas, TX 75204 in Dallas, Texas. The project has an estimated value of $24.5M covering 26,260 sq ft. City of Dallas is the property owner and BRW Architects is the design firm of record. The project was registered with TDLR on September 25, 2023.

Frequently Asked Questions

What is Dallas Water Utilities Service Center?

Dallas Water Utilities Service Center is a new construction project at 12000 Greenville Ave 1500 Marilla St in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New construction of a two-story concrete tilt-up panel building with offices, warehouse, and training room. The site will consist of staff parking, large fleet parking, and visitor parking.

Is Dallas Water Utilities Service Center open in Dallas?

Dallas Water Utilities Service Center was scheduled to finish construction in Feb 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Dallas Water Utilities Service Center located?

Dallas Water Utilities Service Center is located at 12000 Greenville Ave 1500 Marilla St, Dallas, TX, 75204, in Dallas County.

Who is the owner or developer of Dallas Water Utilities Service Center?

City of Dallas is the property owner/developer of record for Dallas Water Utilities Service Center, per its TDLR project registration.

Who is the architect or design firm for Dallas Water Utilities Service Center?

BRW Architects is the design firm of record for Dallas Water Utilities Service Center, according to its TDLR filing.

How much does Dallas Water Utilities Service Center cost and how big is it?

Dallas Water Utilities Service Center has an estimated construction value of $24.5M and approximately 26,260 square feet (about $932/sqft), based on its TDLR filing.

Scope of Work

New construction of a two-story concrete tilt-up panel building with offices, warehouse, and training room. The site will consist of staff parking, large fleet parking, and visitor parking.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

12000 Greenville Ave 1500 Marilla St, Dallas, TX, 75204

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75204 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.