Project intelligenceTDLR TABS2024002138New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

HARMONY PUBLIC SCHOOL, LAKESIDE in San Antonio, TX

LAKESIDE PARKWAY NEAR I-410 ACCESS ROAD, San Antonio, TX, 78245

Target date passed (Oct 2025)Project Registered

HARMONY PUBLIC SCHOOL, LAKESIDE is a new construction project at LAKESIDE PARKWAY NEAR I-410 ACCESS ROAD, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Oct 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $18.0M across about 79,970 sq ft.

Estimated project value
$18.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
79,970 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$225/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 6mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 2, 2023744 days across supplied datesOct 15, 2025

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    191 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    553 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78245 (San Antonio)

One email per change. Unsubscribe in one click. Privacy.

HARMONY PUBLIC SCHOOL, LAKESIDE is a New Construction project located at LAKESIDE PARKWAY NEAR I-410 ACCESS ROAD, San Antonio, TX 78245 in San Antonio, Texas. The project has an estimated value of $18.0M covering 79,970 sq ft. Dr. Edward Caglar is the property owner. The project was registered with TDLR on October 2, 2023.

Frequently Asked Questions

What is HARMONY PUBLIC SCHOOL, LAKESIDE?

HARMONY PUBLIC SCHOOL, LAKESIDE is a new construction project at LAKESIDE PARKWAY NEAR I-410 ACCESS ROAD in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project scope of work includes a ground up construction of 79970 sq ft of Two-story middle & high school facility including parking lot, athletic track and field , outdoor basketball court and landscaping.

Is HARMONY PUBLIC SCHOOL, LAKESIDE open in San Antonio?

HARMONY PUBLIC SCHOOL, LAKESIDE was scheduled to finish construction in Oct 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is HARMONY PUBLIC SCHOOL, LAKESIDE located?

HARMONY PUBLIC SCHOOL, LAKESIDE is located at LAKESIDE PARKWAY NEAR I-410 ACCESS ROAD, San Antonio, TX, 78245, in Bexar County.

Who is the owner or developer of HARMONY PUBLIC SCHOOL, LAKESIDE?

Dr. Edward Caglar is the property owner/developer of record for HARMONY PUBLIC SCHOOL, LAKESIDE, per its TDLR project registration.

How much does HARMONY PUBLIC SCHOOL, LAKESIDE cost and how big is it?

HARMONY PUBLIC SCHOOL, LAKESIDE has an estimated construction value of $18.0M and approximately 79,970 square feet (about $225/sqft), based on its TDLR filing.

Scope of Work

The project scope of work includes a ground up construction of 79970 sq ft of Two-story middle & high school facility including parking lot, athletic track and field , outdoor basketball court and landscaping.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

LAKESIDE PARKWAY NEAR I-410 ACCESS ROAD, San Antonio, TX, 78245

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78245 (San Antonio)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Antonio?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.