Project intelligenceTDLR TABS2024002324Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

City of Lyford Proposed Improvements to the Downtown District

Park Ave from Broadway to Main Ave. Areas on Broadway and Main Ave adjacent to Park Av, Lyford, TX, 78569

Construction complete · Jan 2025Project Closed

City of Lyford Proposed Improvements to the Downtown District is a renovation/alteration project at Park Ave from Broadway to Main Ave. Areas on Broadway and Main Ave adjacent to Park Av, Lyford, in Willacy County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2025). The project has an estimated value of $470K across about 8,840 sq ft.

Estimated project value
$470K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
8,840 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$53/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 3, 2023486 days across supplied datesJan 31, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    125 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    361 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

📰About City of Lyford Proposed Improvements to the Downtown District

The City of Lyford Proposed Improvements to the Downtown District project is complete. TDLR closed the project file in January 2025, marking the end of the accessibility review process for this construction. The work focused on Park Avenue from Broadway to Main Avenue in Lyford, Texas, covering 8,840 square feet of public land in Willacy County. This renovation aimed to replace older infrastructure with modern, compliant facilities for pedestrians and drivers.

The scope of work included the demolition of existing walkways, curbs, and gutters, along with the removal of minor vegetation. Construction then proceeded to build ADA-compliant walkway facilities. This new infrastructure features handrails, curb ramps, and elevation ramps to ensure safe access for all pedestrians. The project also added pavement markings and updated parking signage to guide users clearly through the area.

Project Details and Cost

With an estimated cost of $470,000, the project came in close to the county median for similar renovation filings. The cost per square foot was calculated at $53, which is also close to the Willacy County median of $59 for this type of work. The scheduled build window lasted 361 days, a period longer than the county median of 109 days for comparable projects. This extended timeline likely reflected the complexity of coordinating demolition and new construction in a busy downtown setting.

Marcia Appia Civil Infrastructure Consultant Engineers, LLC served as the design firm of record for the project. David L Gomez was the registered accessibility specialist responsible for ensuring the work met legal requirements. The project was registered with TDLR in October 2023, with construction starting in February 2024. The work concluded in January 2025, marking the end of the accessibility review process for this construction.

The City of Lyford has previously undertaken other accessibility projects, including the Lyford Rural Health Clinic, which also closed its TDLR file. This downtown improvement fits within a broader effort by the city to maintain and upgrade public infrastructure. This location detail is relevant for understanding the site's environmental context and potential risks associated with construction in flood-prone areas.

For residents and visitors, the changes mean a more accessible and safer downtown environment. The new walkways and ramps facilitate easier movement for people with disabilities, while the updated signage helps manage traffic and parking. The project represents a significant investment in the quality of life for the Lyford community, with a population of about 4,079 according to Census estimates. The median household income in the area is $57,000, and the median owner-occupied home value is $103,200, indicating a stable residential base that benefits from improved public spaces.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78569 (Lyford)

One email per change. Unsubscribe in one click. Privacy.

City of Lyford Proposed Improvements to the Downtown District is a Renovation/Alteration project located at Park Ave from Broadway to Main Ave. Areas on Broadway and Main Ave adjacent to Park Av, Lyford, TX 78569 in Lyford, Texas. The project has an estimated value of $470K covering 8,840 sq ft. City of Lyford is the property owner and Marcia Appia Civil Infrastructure Consultant Engineers, LLC is the design firm of record. The project was registered with TDLR on October 3, 2023.

Frequently Asked Questions

Is the project open?

The TDLR record shows the project file was closed in January 2025, indicating the construction and accessibility review process are complete. The facts do not specify a business opening date, as this is a public infrastructure project.

Who designed the project?

Marcia Appia Civil Infrastructure Consultant Engineers, LLC was the design firm of record. David L Gomez served as the registered accessibility specialist for the project.

What was the cost per square foot?

The project cost $53 per square foot, based on the estimated cost of $470,000 and 8,840 square feet of work.

Where is the project located?

The project is located on Park Avenue from Broadway to Main Avenue in Lyford, Texas, within Willacy County.

What type of work was done?

The work involved demolition of old walkways and construction of ADA-compliant facilities, including handrails, curb ramps, and parking signage.

What is City of Lyford Proposed Improvements to the Downtown District?

City of Lyford Proposed Improvements to the Downtown District is a renovation/alteration project at Park Ave from Broadway to Main Ave. Areas on Broadway and Main Ave adjacent to Park Av in Lyford, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Demolition of existing walkways and curb and gutter, and minor vegetation removal. Construction of ADA compliant walkway facilities including handrail, curb ramps, elevation ramps, pavement markings, and parking signage.

Is City of Lyford Proposed Improvements to the Downtown District open in Lyford?

Construction on City of Lyford Proposed Improvements to the Downtown District is complete — TDLR records show the project passed its required accessibility inspection in Jan 2025. The building is finished and very likely open.

Where is City of Lyford Proposed Improvements to the Downtown District located?

City of Lyford Proposed Improvements to the Downtown District is located at Park Ave from Broadway to Main Ave. Areas on Broadway and Main Ave adjacent to Park Av, Lyford, TX, 78569, in Willacy County.

Who is the owner or developer of City of Lyford Proposed Improvements to the Downtown District?

City of Lyford is the property owner/developer of record for City of Lyford Proposed Improvements to the Downtown District, per its TDLR project registration.

Who is the architect or design firm for City of Lyford Proposed Improvements to the Downtown District?

Marcia Appia Civil Infrastructure Consultant Engineers, LLC is the design firm of record for City of Lyford Proposed Improvements to the Downtown District, according to its TDLR filing.

How much does City of Lyford Proposed Improvements to the Downtown District cost and how big is it?

City of Lyford Proposed Improvements to the Downtown District has an estimated construction value of $470K and approximately 8,840 square feet (about $53/sqft), based on its TDLR filing.

Scope of Work

Demolition of existing walkways and curb and gutter, and minor vegetation removal. Construction of ADA compliant walkway facilities including handrail, curb ramps, elevation ramps, pavement markings, and parking signage.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Park Ave from Broadway to Main Ave. Areas on Broadway and Main Ave adjacent to Park Av, Lyford, TX, 78569

Loading location map…
26.41021, -97.79133

Watch all construction in 78569 (Lyford)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.