Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Rockwall ISD Utley Middle School Phase 1 Renovations
1201 T L Townsend Dr, Rockwall, TX, 75087
Rockwall ISD Utley Middle School Phase 1 Renovations is a renovation/alteration project at 1201 T L Townsend Dr, Rockwall, in Rockwall County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Nov 2024 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $16.7M across about 48,620 sq ft.
- Estimated project value
- $16.7M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 48,620 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $343/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 11 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
87 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
326 days after the preceding date shown.
Source: TDLR filing
View source record
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75087 (Rockwall)
One email per change. Unsubscribe in one click. Privacy.
Rockwall ISD Utley Middle School Phase 1 Renovations is a Renovation/Alteration project located at 1201 T L Townsend Dr, Rockwall, TX 75087 in Rockwall, Texas. The project has an estimated value of $16.7M covering 48,620 sq ft. Rockwall Independent School District is the property owner. The project was registered with TDLR on October 6, 2023.
Frequently Asked Questions
What is Rockwall ISD Utley Middle School Phase 1 Renovations?
Rockwall ISD Utley Middle School Phase 1 Renovations is a renovation/alteration project at 1201 T L Townsend Dr in Rockwall, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Demolition and Renovation of a portion of the Existing Utley Middle School Interior. The renovation scope involves a redesign of the following spaces: Cafeteria, Kitchen, Library and Fine Art Spaces. Temporary portable buildings will be…
Is Rockwall ISD Utley Middle School Phase 1 Renovations open in Rockwall?
Rockwall ISD Utley Middle School Phase 1 Renovations was scheduled to finish construction in Nov 2024 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Rockwall ISD Utley Middle School Phase 1 Renovations located?
Rockwall ISD Utley Middle School Phase 1 Renovations is located at 1201 T L Townsend Dr, Rockwall, TX, 75087, in Rockwall County.
Who is the owner or developer of Rockwall ISD Utley Middle School Phase 1 Renovations?
Rockwall Independent School District is the property owner/developer of record for Rockwall ISD Utley Middle School Phase 1 Renovations, per its TDLR project registration.
How much does Rockwall ISD Utley Middle School Phase 1 Renovations cost and how big is it?
Rockwall ISD Utley Middle School Phase 1 Renovations has an estimated construction value of $16.7M and approximately 48,620 square feet (about $343/sqft), based on its TDLR filing.
Scope of Work
Demolition and Renovation of a portion of the Existing Utley Middle School Interior. The renovation scope involves a redesign of the following spaces: Cafeteria, Kitchen, Library and Fine Art Spaces. Temporary portable buildings will be installed on-
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1201 T L Townsend Dr, Rockwall, TX, 75087
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 75087 (Rockwall)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Rockwall?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.