Rockwall ISD Utley Middle School Phase 1 Renovations

1201 T L Townsend Dr, Rockwall, TX, 75087

Target date passed (Nov 2024)Project Registered

Rockwall ISD Utley Middle School Phase 1 Renovations is a renovation/alteration project at 1201 T L Townsend Dr, Rockwall, in Rockwall County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Nov 2024 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $16.7M across about 48,620 sq ft.

Estimated project value
$16.7M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
48,620 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$343/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
11 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 6, 2023413 days across supplied datesNov 22, 2024

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    87 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    326 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75087 (Rockwall)

One email per change. Unsubscribe in one click. Privacy.

Rockwall ISD Utley Middle School Phase 1 Renovations is a Renovation/Alteration project located at 1201 T L Townsend Dr, Rockwall, TX 75087 in Rockwall, Texas. The project has an estimated value of $16.7M covering 48,620 sq ft. Rockwall Independent School District is the property owner. The project was registered with TDLR on October 6, 2023.

Frequently Asked Questions

What is Rockwall ISD Utley Middle School Phase 1 Renovations?

Rockwall ISD Utley Middle School Phase 1 Renovations is a renovation/alteration project at 1201 T L Townsend Dr in Rockwall, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Demolition and Renovation of a portion of the Existing Utley Middle School Interior. The renovation scope involves a redesign of the following spaces: Cafeteria, Kitchen, Library and Fine Art Spaces. Temporary portable buildings will be…

Is Rockwall ISD Utley Middle School Phase 1 Renovations open in Rockwall?

Rockwall ISD Utley Middle School Phase 1 Renovations was scheduled to finish construction in Nov 2024 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Rockwall ISD Utley Middle School Phase 1 Renovations located?

Rockwall ISD Utley Middle School Phase 1 Renovations is located at 1201 T L Townsend Dr, Rockwall, TX, 75087, in Rockwall County.

Who is the owner or developer of Rockwall ISD Utley Middle School Phase 1 Renovations?

Rockwall Independent School District is the property owner/developer of record for Rockwall ISD Utley Middle School Phase 1 Renovations, per its TDLR project registration.

How much does Rockwall ISD Utley Middle School Phase 1 Renovations cost and how big is it?

Rockwall ISD Utley Middle School Phase 1 Renovations has an estimated construction value of $16.7M and approximately 48,620 square feet (about $343/sqft), based on its TDLR filing.

Scope of Work

Demolition and Renovation of a portion of the Existing Utley Middle School Interior. The renovation scope involves a redesign of the following spaces: Cafeteria, Kitchen, Library and Fine Art Spaces. Temporary portable buildings will be installed on-

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1201 T L Townsend Dr, Rockwall, TX, 75087

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75087 (Rockwall)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Rockwall?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.