Project has been registered with TDLR and is in pre-construction phase
Rockwall ISD Utley Middle School Phase 1 Renovations is a Renovation/Alteration project located at 1201 T L Townsend Dr, Rockwall, TX 75087 in Rockwall, Texas. The project has an estimated value of $16.7M covering 48,620 sq ft. Rockwall Independent School District is the property owner. The project was registered with TDLR on October 6, 2023.
Demolition and Renovation of a portion of the Existing Utley Middle School Interior. The renovation scope involves a redesign of the following spaces: Cafeteria, Kitchen, Library and Fine Art Spaces. Temporary portable buildings will be installed on-
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Oct 6, 2023
Review Complete
Inspection Complete
Closed