Funding type
This project is privately funded, on private land for private use.
Green & Clean Car Wash in Midland, TX
5400 Thomason Drive, Midland, TX, 79701
Green & Clean Car Wash is a new construction project at 5400 Thomason Drive, Midland, in Midland County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $500K across about 5,691 sq ft.
- Estimated project value
- $500K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 5,691 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $88/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 7mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
51 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
943 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Green & Clean Car Wash
Green & Clean Car Wash in Midland is a new construction project registered with the Texas Department of Licensing and Regulation (TDLR) in October 2023. The facility is located at 5400 Thomason Drive in Midland County and covers 5,691 square feet. Chet Gray is the owner and developer of record for this privately funded development on private land. The estimated cost for the project is $500,000, which calculates to $88 per square foot. Morales Design Group serves as the design firm of record for the structure.
The scope of work includes CMU structural building, paving, electrical, and plumbing. The filing indicates a construction start date of December 2023 with a scheduled completion date of July 2026. This scheduled build window of 943 days is longer than the county median of 243 days for similar new construction filings. The estimated cost is below the county median for its type, and the cost per square foot is below the county median of $169.
The project was registered with TDLR in October 2023 with a target completion of July 2026; no plan review or inspection has been recorded since, so whether it proceeded is not confirmed in the public record. The TDLR status remains listed as Project Registered. The owner, Chet Gray, has three other TDLR-registered projects totaling $3,180,159. These include Enterprise Truck Midland, which is closed; Midland Warehouse and Office Buildings, with review complete; and Gray Car Wash #2, which is registered.
Midland County unemployment rate (FRED, September 2026): 3.2 percent, lower than a year earlier. The U.S. Census ACS 2023 five-year estimates for ZIP 79701 show a population of about 27,678 and a median household income of $57,679. There are 11,393 housing units in the area, with a median owner-occupied home value of $204,000. Housing is mostly owner-occupied in this ZIP code.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79701 (Midland)
One email per change. Unsubscribe in one click. Privacy.
Green & Clean Car Wash is a New Construction project located at 5400 Thomason Drive, Midland, TX 79701 in Midland, Texas. The project has an estimated value of $500K covering 5,691 sq ft. Chet Gray is the property owner and Morales Design Group is the design firm of record. The project was registered with TDLR on October 11, 2023.
Frequently Asked Questions
Is Green & Clean Car Wash open?
The TDLR record covers construction only and does not record whether the business has started serving customers. The project status is registered, but no inspections have been recorded to confirm completion.
Who is the owner of the Green & Clean Car Wash project?
Chet Gray is the owner and developer of record for this new construction project located at 5400 Thomason Drive in Midland.
What is the estimated cost of the project?
The estimated cost for the Green & Clean Car Wash construction is $500,000. This covers 5,691 square feet of new building space.
When is the project scheduled to be completed?
The filing lists a completion date of July 2026. However, no plan review or inspection has been recorded since the October 2023 registration.
Who is the design firm for this project?
Morales Design Group is the design firm of record for the Green & Clean Car Wash new construction project in Midland.
What is Green & Clean Car Wash?
Green & Clean Car Wash is a new construction project at 5400 Thomason Drive in Midland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: CMU structural building, paving, electrical @ plumbing
Is Green & Clean Car Wash open in Midland?
Green & Clean Car Wash was scheduled to finish construction in Jul 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Green & Clean Car Wash located?
Green & Clean Car Wash is located at 5400 Thomason Drive, Midland, TX, 79701, in Midland County.
Who is the owner or developer of Green & Clean Car Wash?
Chet Gray is the property owner/developer of record for Green & Clean Car Wash, per its TDLR project registration.
Who is the architect or design firm for Green & Clean Car Wash?
Morales Design Group is the design firm of record for Green & Clean Car Wash, according to its TDLR filing.
How much does Green & Clean Car Wash cost and how big is it?
Green & Clean Car Wash has an estimated construction value of $500K and approximately 5,691 square feet (about $88/sqft), based on its TDLR filing.
Scope of Work
CMU structural building, paving, electrical @ plumbing
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
5400 Thomason Drive, Midland, TX, 79701
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 79701 (Midland)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Midland?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.