Level 1 Phase 1
Level 1 Phase 1 is a renovation/alteration project at 1360 Post Oak Blvd., Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2024). The project has an estimated value of $140K across about 1,201 sq ft.
๐Project Metrics
TDLR #TABS2024002929Project Closed
Project has been completed and closed
Level 1 Phase 1 is a Renovation/Alteration project located at 1360 Post Oak Blvd., Houston, TX 77056 in Houston, Texas. The project has an estimated value of $140K covering 1,201 sq ft. Four Oaks Place Operating LP is the property owner and CDI Douglass Pye, Inc. is the design firm of record. The project was registered with TDLR on October 11, 2023.
โFrequently Asked Questions
What is Level 1 Phase 1?
Level 1 Phase 1 is a renovation/alteration project at 1360 Post Oak Blvd. in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Renovation
Is Level 1 Phase 1 open in Houston?
Construction on Level 1 Phase 1 is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2024. The building is finished and very likely open.
Where is Level 1 Phase 1 located?
Level 1 Phase 1 is located at 1360 Post Oak Blvd., Houston, TX, 77056, in Harris County.
Who is the owner or developer of Level 1 Phase 1?
Four Oaks Place Operating LP is the property owner/developer of record for Level 1 Phase 1, per its TDLR project registration.
Who is the architect or design firm for Level 1 Phase 1?
CDI Douglass Pye, Inc. is the design firm of record for Level 1 Phase 1, according to its TDLR filing.
How much does Level 1 Phase 1 cost and how big is it?
Level 1 Phase 1 has an estimated construction value of $140K and approximately 1,201 square feet (about $117/sqft), based on its TDLR filing.
๐Scope of Work
Interior Renovation
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 11, 2023
Review Complete
Inspection Complete
Closed
Mar 31, 2024