Project intelligenceTDLR TABS2024003383Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Clay County Building

205 N. Bridge Street, Henrietta, TX, 76365

Construction complete · May 2024Project Closed

Clay County Building is a renovation/alteration project at 205 N. Bridge Street, Henrietta, in Clay County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2024). The project has an estimated value of $692K across about 5,360 sq ft.

Estimated project value
$692K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
5,360 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$129/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 17, 2023199 days across supplied datesMay 3, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    45 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    154 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76365 (Henrietta)

One email per change. Unsubscribe in one click. Privacy.

Clay County Building is a Renovation/Alteration project located at 205 N. Bridge Street, Henrietta, TX 76365 in Henrietta, Texas. The project has an estimated value of $692K covering 5,360 sq ft. Clay County is the property owner and Joseph A. Ross, Architect Inc. is the design firm of record. The project was registered with TDLR on October 17, 2023.

Frequently Asked Questions

What is Clay County Building?

Clay County Building is a renovation/alteration project at 205 N. Bridge Street in Henrietta, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A 5,360 sf interior renovation with limited site improvements. A 1,615 sf area of existing office space is not included in the renovation project. Renovation will include flex space, offices, public restrooms and new electrical equipment.

Is Clay County Building open in Henrietta?

Construction on Clay County Building is complete — TDLR records show the project passed its required accessibility inspection in May 2024. The building is finished and very likely open.

Where is Clay County Building located?

Clay County Building is located at 205 N. Bridge Street, Henrietta, TX, 76365, in Clay County.

Who is the owner or developer of Clay County Building?

Clay County is the property owner/developer of record for Clay County Building, per its TDLR project registration.

Who is the architect or design firm for Clay County Building?

Joseph A. Ross, Architect Inc. is the design firm of record for Clay County Building, according to its TDLR filing.

How much does Clay County Building cost and how big is it?

Clay County Building has an estimated construction value of $692K and approximately 5,360 square feet (about $129/sqft), based on its TDLR filing.

Scope of Work

A 5,360 sf interior renovation with limited site improvements. A 1,615 sf area of existing office space is not included in the renovation project. Renovation will include flex space, offices, public restrooms and new electrical equipment.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

205 N. Bridge Street, Henrietta, TX, 76365

Location by street address

Watch all construction in 76365 (Henrietta)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Henrietta?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.