Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Laredo ISD Martin High School Cafeteria Remodeling-Expansion
2000 San Bernando Ave, Laredo, TX, 78040
Laredo ISD Martin High School Cafeteria Remodeling-Expansion is a renovation/alteration project at 2000 San Bernando Ave, Laredo, in Webb County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2024). The project has an estimated value of $1.9M across about 12,500 sq ft.
- Estimated project value
- $1.9M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 12,500 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $152/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
1 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
347 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78040 (Laredo)
One email per change. Unsubscribe in one click. Privacy.
Laredo ISD Martin High School Cafeteria Remodeling-Expansion is a Renovation/Alteration project located at 2000 San Bernando Ave, Laredo, TX 78040 in Laredo, Texas. The project has an estimated value of $1.9M covering 12,500 sq ft. Laredo Independent School District is the property owner and Sepulveda Associates Architects, Inc. is the design firm of record. The project was registered with TDLR on October 19, 2023.
Frequently Asked Questions
What is Laredo ISD Martin High School Cafeteria Remodeling-Expansion?
Laredo ISD Martin High School Cafeteria Remodeling-Expansion is a renovation/alteration project at 2000 San Bernando Ave in Laredo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Cosmetic Renovations and Expansion of Assembly space unto the existing Breezeways New Canopies and existing restrooms to be re-tiled
Is Laredo ISD Martin High School Cafeteria Remodeling-Expansion open in Laredo?
Construction on Laredo ISD Martin High School Cafeteria Remodeling-Expansion is complete — TDLR records show the project passed its required accessibility inspection in Sep 2024. The building is finished and very likely open.
Where is Laredo ISD Martin High School Cafeteria Remodeling-Expansion located?
Laredo ISD Martin High School Cafeteria Remodeling-Expansion is located at 2000 San Bernando Ave, Laredo, TX, 78040, in Webb County.
Who is the owner or developer of Laredo ISD Martin High School Cafeteria Remodeling-Expansion?
Laredo Independent School District is the property owner/developer of record for Laredo ISD Martin High School Cafeteria Remodeling-Expansion, per its TDLR project registration.
Who is the architect or design firm for Laredo ISD Martin High School Cafeteria Remodeling-Expansion?
Sepulveda Associates Architects, Inc. is the design firm of record for Laredo ISD Martin High School Cafeteria Remodeling-Expansion, according to its TDLR filing.
How much does Laredo ISD Martin High School Cafeteria Remodeling-Expansion cost and how big is it?
Laredo ISD Martin High School Cafeteria Remodeling-Expansion has an estimated construction value of $1.9M and approximately 12,500 square feet (about $152/sqft), based on its TDLR filing.
Scope of Work
Cosmetic Renovations and Expansion of Assembly space unto the existing Breezeways New Canopies and existing restrooms to be re-tiled
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2000 San Bernando Ave, Laredo, TX, 78040
Related Projects
Same Owner
$6.85B totalWatch all construction in 78040 (Laredo)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Laredo?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.