Project intelligenceTDLR TABS2024004255Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

UE Beltway 225 Phase 2 - TI Owens Corning in Pasadena, TX

826 E Sam Houston Pkwy South, Pasadena, TX, 77503

Target date passed (Jan 2024)Project Registered

UE Beltway 225 Phase 2 - TI Owens Corning is a renovation/alteration project at 826 E Sam Houston Pkwy South, Pasadena, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jan 2024 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $396K across about 7,825 sq ft.

Estimated project value
$396K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
7,825 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$51/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 30, 202393 days across supplied datesJan 31, 2024

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    31 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    62 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77503 (Pasadena)

One email per change. Unsubscribe in one click. Privacy.

UE Beltway 225 Phase 2 - TI Owens Corning is a Renovation/Alteration project located at 826 E Sam Houston Pkwy South, Pasadena, TX 77503 in Pasadena, Texas. The project has an estimated value of $396K covering 7,825 sq ft. BELTWAY 225, LLC is the property owner and POWERS BROWN ARCHITECTURE is the design firm of record. The project was registered with TDLR on October 30, 2023.

Frequently Asked Questions

What is UE Beltway 225 Phase 2 - TI Owens Corning?

UE Beltway 225 Phase 2 - TI Owens Corning is a renovation/alteration project at 826 E Sam Houston Pkwy South in Pasadena, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 7,825 SF TENANT BUILD OUT FOR OWENS CORNING WITHIN AN EXISTING SHELL BUILDING OF 22000SF; TO INCLUDE: CONFERENCE, BREAK, CLASSROOM, RRs & RRs WITH SHOWERS, TOOL ROOM, SCIENCE TESTING AREA AND APPLICATION TRAINING AREA.

Is UE Beltway 225 Phase 2 - TI Owens Corning open in Pasadena?

UE Beltway 225 Phase 2 - TI Owens Corning was scheduled to finish construction in Jan 2024 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is UE Beltway 225 Phase 2 - TI Owens Corning located?

UE Beltway 225 Phase 2 - TI Owens Corning is located at 826 E Sam Houston Pkwy South, Pasadena, TX, 77503, in Harris County.

Who is the owner or developer of UE Beltway 225 Phase 2 - TI Owens Corning?

BELTWAY 225, LLC is the property owner/developer of record for UE Beltway 225 Phase 2 - TI Owens Corning, per its TDLR project registration.

Who is the architect or design firm for UE Beltway 225 Phase 2 - TI Owens Corning?

POWERS BROWN ARCHITECTURE is the design firm of record for UE Beltway 225 Phase 2 - TI Owens Corning, according to its TDLR filing.

How much does UE Beltway 225 Phase 2 - TI Owens Corning cost and how big is it?

UE Beltway 225 Phase 2 - TI Owens Corning has an estimated construction value of $396K and approximately 7,825 square feet (about $51/sqft), based on its TDLR filing.

Scope of Work

7,825 SF TENANT BUILD OUT FOR OWENS CORNING WITHIN AN EXISTING SHELL BUILDING OF 22000SF; TO INCLUDE: CONFERENCE, BREAK, CLASSROOM, RRs & RRs WITH SHOWERS, TOOL ROOM, SCIENCE TESTING AREA AND APPLICATION TRAINING AREA.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

826 E Sam Houston Pkwy South, Pasadena, TX, 77503

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77503 (Pasadena)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Pasadena?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.