Under construction๐Ÿ“Review Complete๐Ÿ—๏ธ New Construction๐Ÿ’ต This project is privately funded, on private land for private use.

Settlers Park Junction

2010 CR 122 N, Georgetown, TX 78665, Georgetown, TX, 78665

Settlers Park Junction is a new construction project at 2010 CR 122 N, Georgetown, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $79.0M across about 289,152 sq ft.

Construction50%

๐Ÿ“ŠProject Metrics

TDLR #TABS2024004640
$79.0M
Project Value
289,152
Square Feet
$273/sqft
Cost/SqFt
2 years
Duration
Registered:Nov 2, 2023
Start:Jun 1, 2024
Target:Jun 1, 2026
๐Ÿ“

Review Complete

Design review complete, construction may proceed

Settlers Park Junction is a New Construction project located at 2010 CR 122 N, Georgetown, TX 78665 in Georgetown, Texas. The project has an estimated value of $79.0M covering 289,152 sq ft. The Blackburn Group, LLC is the property owner and Kephart is the design firm of record. The project was registered with TDLR on November 2, 2023.

โ“Frequently Asked Questions

What is Settlers Park Junction?

Settlers Park Junction is a new construction project at 2010 CR 122 N in Georgetown, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 306 Multifamily units, 18 builidngs.

Is Settlers Park Junction open in Georgetown?

Settlers Park Junction is currently under construction in Georgetown, TX. Its current TDLR status is "Review Complete".

Where is Settlers Park Junction located?

Settlers Park Junction is located at 2010 CR 122 N, Georgetown, TX, 78665, in Williamson County.

Who is the owner or developer of Settlers Park Junction?

The Blackburn Group, LLC is the property owner/developer of record for Settlers Park Junction, per its TDLR project registration.

Who is the architect or design firm for Settlers Park Junction?

Kephart is the design firm of record for Settlers Park Junction, according to its TDLR filing.

How much does Settlers Park Junction cost and how big is it?

Settlers Park Junction has an estimated construction value of $79.0M and approximately 289,152 square feet (about $273/sqft), based on its TDLR filing.

๐Ÿ“‹Scope of Work

306 Multifamily units, 18 builidngs.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
November 2, 2023
Review Complete
November 2, 2023
Construction Start
June 1, 2024
Expected Completion
June 1, 2026

๐Ÿ“…Project Timeline

Filed

Nov 2, 2023

Review Complete

Nov 2, 2023

Inspection Complete

Closed

๐Ÿ“„Related City Permits

Building permits found at or near this location

2010 E 8TH ST

Express: Tub to shower conversion. Replacement of complete existing central and air system with or without duct work replace evaporator coil and condenser.

ActiveMechanical PermitRepairJul 2026
View Details
2026-097165 MP
๐Ÿ”งVelocity Heating & Air LLC
2010 CHARLOTTE ESTATES DR

Replacement of complete existing central heat and air system with or without duct work Changeout of existing 3.5-ton horizontal heat pump system on a like-for-like basis

ActiveMechanical PermitChange OutJul 2026
View Details
2026-096092 MP
๐Ÿ”งStrand Brothers Service Experts
2010 ALEGRIA RD

Invoice Summary Install approximately 35 feet of new water service line from the meter to the home including a new homeowner shutoff valve required excavation and permit acquisition. The new water line will be insulated from the meter to the outlet beneath the home. Remove all existing galvanized water piping serving one bathroom and the hot and cold water lines for the water heater. Re-pipe these sections with new PEX piping ensuring all piping is properly supported strapped and insulated upon completion. All work will be completed in accordance with applicable plumbing codes. A final inspection will be scheduled to verify the installation is code-compliant and approved by the local inspector.

ActivePlumbing PermitRepairJul 2026
View Details
2026-096050 PP
๐Ÿ”งPlumbing Outfitters LLC
2010 E 8TH ST

Express: Tub to shower conversion. Replacement of complete existing central and air system with or without duct work replace evaporator coil and condenser.

ActiveBuilding PermitRepairJul 2026
$1
View Details
2026-097165 BP
๐Ÿ”งModified Access Cons
2010 S LAMAR BLVD UNIT 300

No construction proposed. CO request to occupy as is. Asking for CO for suite 300 only. Suite 325 is down for reference. Previously approved 2025 128890 PR permitted partitions and corridors for this suite. Office admin.

FinalBuilding PermitRemodelJul 2026
View Details
2026-045619 BP
๐Ÿ”งHarvey-Cleary Builders ***MAIN***

Get alerts for Williamson

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists