South Bonnie Brae Street Phase 3
South Bonnie Brae Street Phase 3 is a renovation/alteration project at 33°11'02"N, 97°09'41"W to 33°12'26"N, 97°09'41"W, Denton, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $1.5M across about 144,585 sq ft.
📊Project Metrics
TDLR #TABS2024005199Review Complete
Design review complete, construction may proceed
South Bonnie Brae Street Phase 3 is a Renovation/Alteration project located at 33°11'02"N, 97°09'41"W to 33°12'26"N, 97°09'41"W, Denton, TX 76207 in Denton, Texas. The project has an estimated value of $1.5M covering 144,585 sq ft. City of Denton is the property owner and Graham Associates, Inc is the design firm of record. The project was registered with TDLR on November 12, 2023.
❓Frequently Asked Questions
What is South Bonnie Brae Street Phase 3?
South Bonnie Brae Street Phase 3 is a renovation/alteration project at 33°11'02"N, 97°09'41"W to 33°12'26"N, 97°09'41"W in Denton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replacing existing 2 lane roadway with a 4 lane divided roadway. Work will include sidewalk, trails, and ramps. 144,585 S.F. Sidewalk and Trail.
Is South Bonnie Brae Street Phase 3 open in Denton?
South Bonnie Brae Street Phase 3 is currently under construction in Denton, TX. Its current TDLR status is "Review Complete".
Where is South Bonnie Brae Street Phase 3 located?
South Bonnie Brae Street Phase 3 is located at 33°11'02"N, 97°09'41"W to 33°12'26"N, 97°09'41"W, Denton, TX, 76207, in Denton County.
Who is the owner or developer of South Bonnie Brae Street Phase 3?
City of Denton is the property owner/developer of record for South Bonnie Brae Street Phase 3, per its TDLR project registration.
Who is the architect or design firm for South Bonnie Brae Street Phase 3?
Graham Associates, Inc is the design firm of record for South Bonnie Brae Street Phase 3, according to its TDLR filing.
How much does South Bonnie Brae Street Phase 3 cost and how big is it?
South Bonnie Brae Street Phase 3 has an estimated construction value of $1.5M and approximately 144,585 square feet (about $11/sqft), based on its TDLR filing.
📋Scope of Work
Replacing existing 2 lane roadway with a 4 lane divided roadway. Work will include sidewalk, trails, and ramps. 144,585 S.F. Sidewalk and Trail.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
📅Project Timeline
Filed
Nov 12, 2023
Review Complete
Nov 12, 2023
Inspection Complete
Closed