Spring Branch Trail- Phase 2
Spring Branch Trail- Phase 2 is a new construction project at From Shadowlake Dr. to Gessner Drive, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2024). The project has an estimated value of $1.4M across about 35,000 sq ft.
๐Project Metrics
TDLR #TABS2024005349Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes โ permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77043 (Houston)
One email per change. Unsubscribe in one click. Privacy.
Spring Branch Trail- Phase 2 is a New Construction project located at From Shadowlake Dr. to Gessner Drive, Houston, TX 77043 in Houston, Texas. The project has an estimated value of $1.4M covering 35,000 sq ft. Spring Branch Management District is the property owner and Halff is the design firm of record. The project was registered with TDLR on November 14, 2023.
โFrequently Asked Questions
What is Spring Branch Trail- Phase 2?
Spring Branch Trail- Phase 2 is a new construction project at From Shadowlake Dr. to Gessner Drive in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Trail project along existing Buttermilk Creek with a pedestrian hybrid beacon at Gessner Drive
Is Spring Branch Trail- Phase 2 open in Houston?
Construction on Spring Branch Trail- Phase 2 is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2024. The building is finished and very likely open.
Where is Spring Branch Trail- Phase 2 located?
Spring Branch Trail- Phase 2 is located at From Shadowlake Dr. to Gessner Drive, Houston, TX, 77043, in Harris County.
Who is the owner or developer of Spring Branch Trail- Phase 2?
Spring Branch Management District is the property owner/developer of record for Spring Branch Trail- Phase 2, per its TDLR project registration.
Who is the architect or design firm for Spring Branch Trail- Phase 2?
Halff is the design firm of record for Spring Branch Trail- Phase 2, according to its TDLR filing.
How much does Spring Branch Trail- Phase 2 cost and how big is it?
Spring Branch Trail- Phase 2 has an estimated construction value of $1.4M and approximately 35,000 square feet (about $40/sqft), based on its TDLR filing.
๐Scope of Work
Trail project along existing Buttermilk Creek with a pedestrian hybrid beacon at Gessner Drive
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 14, 2023
Review Complete
Inspection Complete
Closed
Nov 30, 2024
๐Related Projects
Property Owner
Design Firm
Registered Accessibility Specialist
Harris County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Harris County
Find General Contractors in HarrisWatch all construction in 77043 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.