Construction complete · Aug 2026Inspection Complete

SL 239, etc. (CSJ: 0161-03-025, etc.) is a new construction project at Various Locations, Del Rio, in Val Verde County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $919K across about 9,761 sq ft.

Estimated project value
$919K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
9,761 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$94/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 14, 2023993 days across supplied datesAug 3, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    183 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    365 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    445 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About SL 239, etc. (CSJ: 0161-03-025, etc.)

Sidewalk and ADA curb ramp installation on State Highway 239 and U.S. Highway 277 in Del Rio reached its final TDLR accessibility inspection in August 2026. This new construction project, filed under the name SL 239 (CSJ: 0161-03-025), is now complete according to the Texas Department of Licensing and Regulation record. The work was executed by TxDOT District: Laredo, the owner of record, with Frank Fonseca serving as the registered accessibility specialist.

The project covered 9,761 square feet of infrastructure across various locations in Del Rio, Val Verde County. The estimated cost for the scope of work was $918,724, which calculates to $94 per square foot. This figure is below the county median of $122 per square foot for similar new construction filings in the region. The total project cost is above the county median of $750,000, reflecting the scale of the roadway improvements.

Timeline and Regulatory Status

Registration with TDLR occurred in November 2023, the same month plan review was completed. Construction began in May 2024, with the filing indicating a scheduled completion date of May 2025. Although that initial target date has passed, the record confirms the project passed its final TDLR accessibility inspection in August 2026. The TDLR status is listed as Inspection Complete, verifying that the accessibility requirements for the new sidewalks and curb ramps have been met.

TxDOT District: Laredo is the owner of record for this project and holds six other TDLR-registered projects in the area, with combined values totaling $46,554,969. These include significant infrastructure works in Laredo, Langtry, and Cotulla. The presence of public funds and Federally funded roadway project status underscores the public nature of this investment in local accessibility. The project fits within a broader pattern of infrastructure development in Val Verde County, where the median scheduled build window for new construction is 232 days. This project’s scheduled build window of 365 days was longer than that median, accounting for the complexity of coordinating work on major state and federal highways.

The surrounding area includes established businesses such as Russell Hardware, Gonzalez Auto Parts, and Stripes Convenience Store. The completion of these ADA-compliant improvements supports accessibility for residents and travelers using these key routes in Del Rio. The record does not indicate any pending issues, and the project is closed out with a successful inspection outcome.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78848 (Del Rio)

One email per change. Unsubscribe in one click. Privacy.

SL 239, etc. (CSJ: 0161-03-025, etc.) is a New Construction project located at Various Locations, Del Rio, TX 78848 in Del Rio, Texas. The project has an estimated value of $919K covering 9,761 sq ft. TxDOT District: Laredo is the property owner. The project was registered with TDLR on November 14, 2023.

Frequently Asked Questions

Is the sidewalk project finished?

Yes, the project passed its final TDLR accessibility inspection in August 2026. The TDLR status is listed as Inspection Complete, indicating construction is finished.

Who is responsible for this project?

TxDOT District: Laredo is the owner of record. Frank Fonseca was the registered accessibility specialist for the filing.

What was the cost per square foot?

The estimated cost was $918,724 for 9,761 square feet, resulting in a cost of $94 per square foot.

Where exactly is the work located?

The work is located at various locations along SL 239 and US 277 in Del Rio, Texas.

What is SL 239, etc. (CSJ: 0161-03-025, etc.)?

SL 239, etc. (CSJ: 0161-03-025, etc.) is a new construction project at Various Locations in Del Rio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sidewalk/ ADA Curb Ramp Installation on SL 239 and US 277 in Del Rio.

Is SL 239, etc. (CSJ: 0161-03-025, etc.) open in Del Rio?

Construction on SL 239, etc. (CSJ: 0161-03-025, etc.) is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is SL 239, etc. (CSJ: 0161-03-025, etc.) located?

SL 239, etc. (CSJ: 0161-03-025, etc.) is located at Various Locations, Del Rio, TX, 78848, in Val Verde County.

Who is the owner or developer of SL 239, etc. (CSJ: 0161-03-025, etc.)?

TxDOT District: Laredo is the property owner/developer of record for SL 239, etc. (CSJ: 0161-03-025, etc.), per its TDLR project registration.

How much does SL 239, etc. (CSJ: 0161-03-025, etc.) cost and how big is it?

SL 239, etc. (CSJ: 0161-03-025, etc.) has an estimated construction value of $919K and approximately 9,761 square feet (about $94/sqft), based on its TDLR filing.

Scope of Work

Sidewalk/ ADA Curb Ramp Installation on SL 239 and US 277 in Del Rio.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Various Locations, Del Rio, TX, 78848

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78848 (Del Rio)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.